Fuzzy-Based Composite Indicator Development Methodology for Evaluating overall Water BOT Project Performance

被引:0
|
作者
Zheng, Yuanyuan [1 ]
机构
[1] Shanghai Univ, Fac Management, Shanghai, Peoples R China
来源
2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM) | 2017年
关键词
fuzzy measure; project performance; composite indicator; utility function; water BOT; REAL OPTIONS; CONSTRUCTION;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The management of long-term infrastructure BOT requires complex administrative and regulatory inputs and sound institutional underpinnings to ensure partners' commitment to the contract over long time frames. Additionally, water BOT develop and use composite indicators to evaluate their overall project performance. This paper propose a novel methodology that uses fuzzy theories and an evaluation indicator system was established based on the development model of water BOT. The proposed methodology includes the utility function for normalizing, the fuzzy measure for weighting, and the fuzzy integral for aggregating. The proposed methodology includes the utility function for normalizing, the fuzzy measure for weighting, and the fuzzy integral for aggregating. A retrospective case study shows that the proposed methodology can help alleviate the indiscrimination. The methodology can contribute more accurate evaluation of overall project performance with higher degrees of performance discrimination.
引用
收藏
页数:6
相关论文
共 29 条