Project portfolio selection under uncertainty with outsourcing opportunities

被引:22
|
作者
Gutjahr, Walter J. [1 ]
Froeschl, Karl A. [2 ]
机构
[1] Univ Vienna, Dept Stat & Decis Support Syst, Vienna, Austria
[2] Univ Vienna, Fac Informat, Vienna, Austria
基金
奥地利科学基金会;
关键词
Project portfolios; Stochastic optimization; Outsourcing; Staff scheduling; Variable neighborhood search; STAFF ASSIGNMENT; ALLOCATION; ALGORITHM; MODEL;
D O I
10.1007/s10696-011-9107-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper presents a stochastic optimization model for project portfolio selection under uncertainty about the real efforts required for the execution of the work packages contained in the projects. As a subproblem, the assignment of the work to human resources and the distribution of work over time is addressed. The available workforce is assumed as multi-skilled. Required efforts are modeled as random variables. The recourse action for the case where the available capacities of the internal human resources do not suffice to cover the actual work times consists in delegating parts of the work to external human resources. The staffing-and-scheduling subproblem is solved by means of a Frank-Wolfe type algorithm. To solve the upper-level problem of project portfolio determination, a modification of the Variable Neighborhood Search (VNS) algorithm is applied. Experimental results for a benchmark of synthetically generated test instances and for an illustrative example from the E-Commerce Competence Center Austria are provided.
引用
收藏
页码:255 / 281
页数:27
相关论文
共 50 条
  • [41] Pharmaceutical R&D project portfolio selection and scheduling under uncertainty: A robust possibilistic optimization approach
    Hesarsorkh, Aghil Hamidi
    Ashayeri, Jalal
    Naeini, Ali Bonyadi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 155
  • [42] DYNAMIC PORTFOLIO SELECTION WITH UNCERTAINTY
    Yu, Mei
    Inoue, Hiroshi
    Takahashi, Satoru
    Shi, Jianming
    INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2009, 17 (02) : 237 - 250
  • [43] Evaluating methods of investment project and optimizing models of portfolio selection in fuzzy uncertainty
    Zhang, Wei-Guo
    Mei, Qin
    Lu, Qian
    Xiao, Wei-Lin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 721 - 728
  • [44] Portfolio selection of distributed energy generation projects considering uncertainty and project interaction under different enterprise strategic scenarios
    Wu, Yunna
    Xu, Chuanbo
    Ke, Yiming
    Li, Xinying
    Li, Lingwenying
    APPLIED ENERGY, 2019, 236 : 444 - 464
  • [45] LIFETIME PORTFOLIO SELECTION UNDER UNCERTAINTY - CONTINUOUS-TIME CASE
    MERTON, RC
    REVIEW OF ECONOMICS AND STATISTICS, 1969, 51 (03) : 247 - 257
  • [46] Robust portfolio selection with subjective risk aversion under dependence uncertainty
    Su, Xiaoshan
    Li, Yuhan
    ECONOMIC MODELLING, 2024, 132
  • [47] Portfolio selection under distributional uncertainty: A relative robust CVaR approach
    Huang, Dashan
    Zhu, Shushang
    Fabozzi, Frank J.
    Fukushima, Masao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 203 (01) : 185 - 194
  • [48] Project Portfolio Selection Considering Uncertainty: Stochastic Dominance-Based Fuzzy Ranking
    Wu, Liang-Hong
    Wu, Liangchuan
    Shi, Jianming
    Chou, Yang-Tai
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (07) : 2048 - 2066
  • [49] Project portfolio Selection Using VIKOR Technique under Fuzzy Environment
    Fouladgar, Mohammad Majid
    Yazdani-Chamzini, Abdolreza
    Yakhchali, Siamak Haji
    Ghasempourabadi, Mohammad Hossein
    Badri, Negar
    CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 236 - 240
  • [50] Portfolio selection of power generation projects considering the synergy of project and uncertainty of decision information
    Tao, Yao
    Luo, Xu
    Wu, Yunna
    Zhang, Lihui
    Liu, Yuanxin
    Xu, Chuanbo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175