Project portfolio selection under uncertainty with outsourcing opportunities

被引:22
|
作者
Gutjahr, Walter J. [1 ]
Froeschl, Karl A. [2 ]
机构
[1] Univ Vienna, Dept Stat & Decis Support Syst, Vienna, Austria
[2] Univ Vienna, Fac Informat, Vienna, Austria
基金
奥地利科学基金会;
关键词
Project portfolios; Stochastic optimization; Outsourcing; Staff scheduling; Variable neighborhood search; STAFF ASSIGNMENT; ALLOCATION; ALGORITHM; MODEL;
D O I
10.1007/s10696-011-9107-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper presents a stochastic optimization model for project portfolio selection under uncertainty about the real efforts required for the execution of the work packages contained in the projects. As a subproblem, the assignment of the work to human resources and the distribution of work over time is addressed. The available workforce is assumed as multi-skilled. Required efforts are modeled as random variables. The recourse action for the case where the available capacities of the internal human resources do not suffice to cover the actual work times consists in delegating parts of the work to external human resources. The staffing-and-scheduling subproblem is solved by means of a Frank-Wolfe type algorithm. To solve the upper-level problem of project portfolio determination, a modification of the Variable Neighborhood Search (VNS) algorithm is applied. Experimental results for a benchmark of synthetically generated test instances and for an illustrative example from the E-Commerce Competence Center Austria are provided.
引用
收藏
页码:255 / 281
页数:27
相关论文
共 50 条
  • [1] Project portfolio selection under uncertainty with outsourcing opportunities
    Walter J. Gutjahr
    Karl A. Froeschl
    Flexible Services and Manufacturing Journal, 2013, 25 : 255 - 281
  • [2] OPTIMAL SELECTION OF A RESEARCH PROJECT PORTFOLIO UNDER UNCERTAINTY
    ALLEN, DH
    JOHNSON, TFN
    CHEMICAL ENGINEER-LONDON, 1970, (241): : C278 - &
  • [3] Research and development project portfolio selection under uncertainty
    Arratia-Martinez, Nancy M.
    Caballero-Fernandez, Rafael
    Litvinchev, Igor
    Lopez-Irarragorri, Fernando
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2018, 9 (03) : 857 - 866
  • [4] Research and development project portfolio selection under uncertainty
    Nancy M. Arratia-Martinez
    Rafael Caballero-Fernandez
    Igor Litvinchev
    Fernando Lopez-Irarragorri
    Journal of Ambient Intelligence and Humanized Computing, 2018, 9 : 857 - 866
  • [5] A variable neighborhood search simheuristic for project portfolio selection under uncertainty
    Javier Panadero
    Jana Doering
    Renatas Kizys
    Angel A. Juan
    Angels Fito
    Journal of Heuristics, 2020, 26 : 353 - 375
  • [6] Project portfolio selection and scheduling problem under material supply uncertainty
    Habibi, Farhad
    Chakrabortty, Ripon Kumar
    Servranckx, Tom
    Abbasi, Alireza
    Vanhoucke, Mario
    OPERATIONS MANAGEMENT RESEARCH, 2024,
  • [7] A variable neighborhood search simheuristic for project portfolio selection under uncertainty
    Panadero, Javier
    Doering, Jana
    Kizys, Renatas
    Juan, Angel A.
    Fito, Angels
    JOURNAL OF HEURISTICS, 2020, 26 (03) : 353 - 375
  • [8] Public R &D project portfolio selection under expenditure uncertainty
    Caglar, Musa
    Gurel, Sinan
    ANNALS OF OPERATIONS RESEARCH, 2024, 341 (01) : 375 - 399
  • [9] Modeling and solving project portfolio and contractor selection problem based on project scheduling under uncertainty
    Namazian, Ali
    Yakhchali, Siamak Haji
    PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 35 - 42
  • [10] Bi-objective project portfolio selection and staff assignment under uncertainty
    Gutjahr, Walter J.
    Reiter, Peter
    OPTIMIZATION, 2010, 59 (03) : 417 - 445