Removal of Total Phosphorus from Septic Tank Effluent by theHybrid Constructed Wetland System

被引:8
|
作者
Wen, Liu [1 ,2 ]
Hua, Cui Li [2 ]
Ping, Zhou Yi [1 ]
Xiang, Lei Ze [1 ]
机构
[1] Zhongkai Univ Agr & Engn, Dept Environm Sci & Engn, Guangzhou 510225, Guangdong, Peoples R China
[2] S China Agr Univ, Dept Environm Sci & Engn, Guangzhou 510642, Peoples R China
基金
中国国家自然科学基金;
关键词
Total phosphorous; Constructed wetlands; Hybrid system; Plant uptake; Removal efficiency; WASTE-WATER TREATMENT; VERTICAL-FLOW; DOMESTIC SEWAGE; DESIGN; PERFORMANCE;
D O I
10.1016/j.proenv.2011.09.328
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The main objectives of this study were to: (1) investigate the performance of TP removal from septic tank effluent by the hybrid constructed wetland consisting of a horizontal flow, and a vertical flow unit in series, (2) compare the discrepancy in TP removal efficiencies by different plant species, and (3) investigate the effects of HRT, plant and season on the removal of TP in the hybrid constructed wetlands. The results show that the average removal rates of total phosphorus (TP) for the hybrid system consisting of HF1+VF1(planted Cyperus alternifolius, Hedychium coronarium Koen) in summer, autumn, winter and spring were, respectively, 96.8%, 97.4%, 94.5%, and 93.4% and were, respectively, 97.6%, 97.7%, 97.2%, and 98.3% for the hybrid system consisting of HF2+VF2(planted Schoenoplectus lacustrwas, canna indica), while were, respectively, 93.1%, 96.6%, 91.6%, and 90.7% for the hybrid system consisting of HF0+VF0 (unplanted). It is apparent that planted wetlands could improve their effluent quality. The removal capacities of phosphorus by four plant species (Cyperus alternifolius, Hedychium coronarium Koen, Schoenoplectus lacustrwas, and canna indica) were compared in these hybrid systems for the treatment of septic tank effluent. The removal capacity of phosphorus by these plants ranged from 2.0 g/m2 to 13.33 g/m2; Cyperus alternifoliu showed the highest uptake on TP, while Hedychium coronarium Koen showed the least uptake. Different plants had different phosphorus capacities by plant uptake. Based on nutrient balance in one year's operation, 2.3% to 15.5% of TP were exhibited by aboveground biomass, indicating that macrophytes are essential to efficient phosphorus removal in the hybrid constructed wetland. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Conference ESIAT2011 Organization Committee.
引用
收藏
页码:2102 / 2107
页数:6
相关论文
共 50 条
  • [31] Evaluation of composite matrix in constructed wetland for phosphorus removal
    Patyal, Vandana
    Jaspal, Dipika
    Khare, Kanchan
    BIORESOURCE TECHNOLOGY REPORTS, 2024, 26
  • [32] Enhancement of total nitrogen removal through effluent recirculation and fate of PPCPs in a hybrid constructed wetland system treating urban wastewater
    Avila, Cristina
    Pelissari, Catiane
    Sezerino, Pablo H.
    Sgroi, Massimiliano
    Roccaro, Paolo
    Garcia, Joan
    SCIENCE OF THE TOTAL ENVIRONMENT, 2017, 584 : 414 - 425
  • [33] The effect of aeration on treatment efficiency and bioenergy generation of septic-tank effluent in constructed wetland-microbial fuel cell
    Ebrahimi, Atieh
    Sivakumar, Muttucumaru
    McLauchlan, Craig
    JOURNAL OF WATER PROCESS ENGINEERING, 2023, 52
  • [34] EFFECTIVE PHOSPHORUS REMOVAL BY ADDING ALUM TO SEPTIC TANK
    BRANDES, M
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1977, 49 (11): : 2285 - 2296
  • [35] Treatment of septic tank effluent using vertical-flow constructed wetlands
    Cui, L
    Luo, SM
    Zhu, XZ
    Liu, YH
    WETLANDS AND REMEDIATION II, 2002, : 225 - 234
  • [36] Removal of Pharmaceuticals in a Macrophyte Pond-Constructed Wetland System and the Effect of a Low Effluent Recirculation
    Guedes-Alonso, Rayco
    Herrera-Melian, Jose A.
    Sanchez-Suarez, Francisca
    Diaz-Mendoza, Veronica
    Sosa-Ferrera, Zoraida
    Santana-Rodriguez, Jose J.
    WATER, 2022, 14 (15)
  • [37] Research on the Removal of Total Nitrogen and Total Phosphorus by Improved Constructed Rapid Infiltration System
    Kang, Aibin
    Wang, Lixuan
    Zhang, Bin
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON GREEN MATERIALS AND ENVIRONMENTAL ENGINEERING (GMEE 2015), 2016, 35 : 70 - 73
  • [38] Nitrogen and phosphorus removal in a wetland treating sludge dewatering effluent
    Tonderski, KS
    Berggren, A
    TRANSFORMATIONS OF NUTRIENTS IN NATURAL AND CONSTRUCTED WETLANDS, 2001, : 187 - 200
  • [39] Removal of Nitrogen and Phosphorus from Effluent of a Secondary Wastewater Treatment Plant Using a Pond–Marsh Wetland System
    Dong-Gill Kim
    Joohyun Park
    Dowon Lee
    Hojeong Kang
    Water, Air, & Soil Pollution, 2011, 214 : 37 - 47
  • [40] FIELD APPLICATION OF A RENEWABLE CONSTRUCTED WETLAND SUBSTRATE FOR PHOSPHORUS REMOVAL
    Rosenquist, Shawn E.
    Hession, W. Cully
    Eick, Matthew J.
    Vaughan, David H.
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2011, 47 (04): : 800 - 812