共 50 条
- [31] Evaluation of composite matrix in constructed wetland for phosphorus removal BIORESOURCE TECHNOLOGY REPORTS, 2024, 26
- [34] EFFECTIVE PHOSPHORUS REMOVAL BY ADDING ALUM TO SEPTIC TANK JOURNAL WATER POLLUTION CONTROL FEDERATION, 1977, 49 (11): : 2285 - 2296
- [35] Treatment of septic tank effluent using vertical-flow constructed wetlands WETLANDS AND REMEDIATION II, 2002, : 225 - 234
- [37] Research on the Removal of Total Nitrogen and Total Phosphorus by Improved Constructed Rapid Infiltration System PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON GREEN MATERIALS AND ENVIRONMENTAL ENGINEERING (GMEE 2015), 2016, 35 : 70 - 73
- [38] Nitrogen and phosphorus removal in a wetland treating sludge dewatering effluent TRANSFORMATIONS OF NUTRIENTS IN NATURAL AND CONSTRUCTED WETLANDS, 2001, : 187 - 200
- [39] Removal of Nitrogen and Phosphorus from Effluent of a Secondary Wastewater Treatment Plant Using a Pond–Marsh Wetland System Water, Air, & Soil Pollution, 2011, 214 : 37 - 47
- [40] FIELD APPLICATION OF A RENEWABLE CONSTRUCTED WETLAND SUBSTRATE FOR PHOSPHORUS REMOVAL JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2011, 47 (04): : 800 - 812