- [31] Fire and temperature protection at the exhaust shaft of the Gotthard-Base-Tunnel (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 219 - 222
- [32] Verification of rock temperature prediction along the Gotthard base tunnel - a prospect for coming tunnel projects UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1714 - 1721
- [34] Gotthard Base Tunnel: UDEC Simulations of Micro Tremors Encountered During Construction ANALYSIS OF DISCONTINUOUS DEFORMATION: NEW DEVELOPMENTS AND APPLICATIONS, 2010, : 373 - 380
- [36] Performance of penetration models for hard rock TBMs in the case of the Gotthard Base Tunnel UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1165 - 1170
- [37] Materials management at the gotthard base tunnel - Experience from 15 years of construction Geomechanik und Tunnelbau, 2009, 2 (05): : 619 - 626
- [38] Extensive concrete and shotcrete systems for the world's longest tunnel (Gotthard base tunnel-56km) NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 62 - 68
- [40] Railways Technology - the key lessons learnt from the Gotthard Base Tunnel project in Switzerland UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1691 - 1697