Scheduling multiple products on parallel machines with setup costs

被引:3
|
作者
Krasik, Vladimir [1 ]
Leung, Joseph [2 ]
Pinedo, Michael [1 ]
Zhang, Jiawei [1 ]
机构
[1] NYU, IOMS Dept, Stern Sch Business, New York, NY 10012 USA
[2] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
关键词
deterministic scheduling; due dates; setup costs; batch scheduling; earliness costs; tardiness costs; inventory control;
D O I
10.1002/nav.20309
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on my one of the machines. There is a demand stream for product type i consisting of n(i) units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c(i)(s) is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo-polynomial time. The polynomiality or pseudo-polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89-96) and Zangwill (Oper Res 14 (1966), 486-507; Manage Sci 15 (1969), 506-527). (C) 2008 Wiley Periodicals, Inc.
引用
收藏
页码:654 / 669
页数:16
相关论文
共 50 条
  • [31] Scheduling with multi-attribute setup times on two identical parallel machines
    Lee, Cheng-Hsiung
    Liao, Ching-Jong
    Chung, Tsui-Ping
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 153 : 130 - 138
  • [32] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
  • [33] Online scheduling of malleable parallel jobs with setup times on two identical machines
    Guo, Shouwei
    Kang, Liying
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 206 (03) : 555 - 561
  • [34] Scheduling unrelated parallel machines with a common server and sequence dependent setup times
    Raboudi, Houda
    Alpan, Gulgun
    Mangione, Fabien
    Tissot, Geoffrey
    Noel, Frederic
    IFAC PAPERSONLINE, 2022, 55 (10): : 2179 - 2184
  • [35] Learning-Based Metaheuristic for Scheduling Unrelated Parallel Machines With Uncertain Setup Times
    Cheng, Chen-Yang
    Pourhejazy, Pourya
    Ying, Kuo-Ching
    Li, Shu-Fen
    Chang, Chieh-Wen
    IEEE ACCESS, 2020, 8 : 74065 - 74082
  • [36] Equal processing and equal setup time cases of scheduling parallel machines with a single server
    Abdekhodaee, AH
    Wirth, A
    Gan, HS
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (11) : 1867 - 1889
  • [37] Metaheuristic for Parallel Machines Scheduling with Resource-assignable Sequence Dependent Setup Times
    Costa Bicalho, Luis Henrique
    dos Santos, Andre Gustavo
    Claudio Arroyo, Jose Elias
    GECCO-2011: PROCEEDINGS OF THE 13TH ANNUAL GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2011, : 449 - 455
  • [38] Order acceptance and scheduling on parallel machines with setup time and machine-eligibility constraints
    Wang B.-L.
    Li T.-K.
    Wang H.-F.
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2019, 41 (04): : 528 - 538
  • [39] Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times
    Perez-Gonzalez, Paz
    Fernandez-Viagas, Victor
    Zamora Garcia, Miguel
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 : 131 - 145
  • [40] A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
    Pereira Lopes, Manuel J.
    Valerio de Carvalho, J. M.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) : 1508 - 1527