Scheduling multiple products on parallel machines with setup costs

被引:3
|
作者
Krasik, Vladimir [1 ]
Leung, Joseph [2 ]
Pinedo, Michael [1 ]
Zhang, Jiawei [1 ]
机构
[1] NYU, IOMS Dept, Stern Sch Business, New York, NY 10012 USA
[2] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
关键词
deterministic scheduling; due dates; setup costs; batch scheduling; earliness costs; tardiness costs; inventory control;
D O I
10.1002/nav.20309
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on my one of the machines. There is a demand stream for product type i consisting of n(i) units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c(i)(s) is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo-polynomial time. The polynomiality or pseudo-polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89-96) and Zangwill (Oper Res 14 (1966), 486-507; Manage Sci 15 (1969), 506-527). (C) 2008 Wiley Periodicals, Inc.
引用
收藏
页码:654 / 669
页数:16
相关论文
共 50 条
  • [1] Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    Kang, S
    Malik, K
    Thomas, LJ
    MANAGEMENT SCIENCE, 1999, 45 (02) : 273 - 289
  • [2] ON SCHEDULING PARALLEL MACHINES WITH 2 SETUP CLASSES
    RAJGOPAL, J
    BIDANDA, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (12) : 2443 - 2458
  • [3] The scheduling for parallel machines with periodic maintenance and setup activities
    Chung, SH
    Tai, YT
    Tsai, PH
    MSV '05: Proceedings of the 2005 International Conference on Modeling, Simulation and Visualization Methods, 2005, : 229 - 235
  • [4] SCHEDULING PARALLEL PROCESSORS WITH SETUP COSTS AND RESOURCE LIMITATIONS
    FRENDEWEY, JO
    SUMICHRAST, RT
    DECISION SCIENCES, 1988, 19 (01) : 138 - 146
  • [5] A GRASP procedure for scheduling orders on parallel machines with setup times
    Mateo, Manuel
    Ribas, Imma
    Companys, Ramon
    DIRECCION Y ORGANIZACION, 2009, 39 : 71 - 78
  • [6] Scheduling jobs on parallel machines with setup times and ready times
    Pfund, Michele
    Fowler, John W.
    Gadkari, Amit
    Chen, Yan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 764 - 782
  • [7] Makespan minimization for scheduling unrelated parallel machines with setup times
    Ying, Kuo-Ching
    Lee, Zne-Jung
    Lin, Shih-Wei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (05) : 1795 - 1803
  • [8] Makespan minimization for scheduling unrelated parallel machines with setup times
    Kuo-Ching Ying
    Zne-Jung Lee
    Shih-Wei Lin
    Journal of Intelligent Manufacturing, 2012, 23 : 1795 - 1803
  • [9] A note on scheduling identical parallel machines with preemptions and setup times
    Boudhar, Mourad
    Dolgui, Alexandre
    Haned, Amina
    Kerdali, Abida
    Kovalev, Sergey
    Kovalyov, Mikhail Y.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (03) : 1203 - 1208
  • [10] A batch sizing and scheduling problem on parallel machines with different speeds, maintenance operations, setup times and energy costs
    Nattaf, Margaux
    Artigues, Christian
    Lopez, Pierre
    Medina, Rosa
    Parada, Victor
    Pradenas, Lorena
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 883 - 891