Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method

被引:20
|
作者
Yang, Ming-Feng [1 ]
Lin, Yi [2 ]
机构
[1] Natl Taiwan Ocean Univ, Dept Transportat Sci, Keelung 20224, Taiwan
[2] Natl Taipei Univ Technol, Coll Management, Taipei 10643, Taiwan
关键词
Project management; Possibilistic programming approach; Two-phase approach; Fuzzy multi-objective linear programming;
D O I
10.1016/j.cie.2013.08.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The aim of this paper is to develop an interactive two-phase method that can help the Project Manager (PM) with solving the fuzzy multi-objective decision problems. Therefore, in this paper, we first revisit the related papers and focus on how to develop an interactive two-phase method. Next, we establish to consider the imprecise nature of the data by fulfilling the possibilistic programming model, and we also assume that each objective work has a fuzzy goal. Finally, for reaching our objective, the detailed numerical example is presented to illustrate the feasibility of applying the proposed approach to PM decision problems at the end of this paper. Results show that our model can be applied as an effective tool. Furthermore, we believe that this approach can be applied to solve other multi-objective decision making problems. (C) 2013 Elsevier Ltd. All rights reserved.
引用
下载
收藏
页码:1061 / 1069
页数:9
相关论文
共 50 条