Prediction of Total Cost of Construction Project with Dependent Cost Items

被引:28
|
作者
Firouzi, Afshin [1 ]
Yang, Wei [2 ]
Li, Chun-Qing [3 ]
机构
[1] Islamic Azad Univ, Fac Engn, Sci & Res Branch, Construct Engn & Management Grp, Tehran 1477893855, Iran
[2] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[3] RMIT Univ, Sch Civil Environm & Chem Engn, Melbourne, Vic 3000, Australia
基金
澳大利亚研究理事会;
关键词
Probability distribution; Cost items; Monte Carlo simulation; Copula; Dependence structure; Cost and schedule; COPULA;
D O I
10.1061/(ASCE)CO.1943-7862.0001194
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects are typically carried out in highly uncertain environments with the risk of cost and time overruns, and subsequent disputes between stakeholders. One of common risk factors is that most cost items of a project are dependent random variables. Thus, correlations between basic cost items need to be considered in predicting the total cost of the project. This paper intends to propose a generic copula-based Monte Carlo simulation method for prediction of construction projects' total costs with dependent cost items. An algorithm to generate the joint probability distribution function of correlated cost items is developed and two examples are presented to demonstrate the applicability of copulas in modeling construction costs as random variables. A merit of the proposed method is that it not only can incorporate all different types of distributions in one framework, but it also captures the best dependence structure between variables. This paper finds that different dependence structures can lead to different probability distributions of total cost. It also finds that the existing goodness of fit tests can be employed in choosing the best performing copula. The paper concludes that the copula-based Monte Carlo simulation method can predict total cost of construction projects with reasonable accuracy.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Research on the Dynamic Cost Management of the Construction Project and the Optimization of the Cost Control
    Jia, Xiaoni
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, ARTS, ECONOMICS AND SOCIAL SCIENCE (ICEMAESS 2017), 2017, 172 : 136 - 139
  • [22] Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items
    Khodakarami, Vahid
    Abdi, Abdollah
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (07) : 1233 - 1245
  • [23] Discussion on the analysis of lifecycle cost for construction project
    Sun, LX
    [J]. PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 2176 - 2179
  • [24] Research on Cost Control of Construction Project in China
    Li, Jinxu
    [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME 2017), 2017, 119 : 817 - 820
  • [25] Problems and Solutions of Construction Project Cost Management
    Wang Miaoting
    Luo Ni
    [J]. 2019 INTERNATIONAL CONFERENCE ON ARTS, MANAGEMENT, EDUCATION AND INNOVATION (ICAMEI 2019), 2019, : 206 - 211
  • [26] Database Design on Construction Project Cost System
    Zhang, Nannan
    Song, Wenfeng
    [J]. PROCEEDINGS OF THE 2016 3RD INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING, MANUFACTURING TECHNOLOGY AND CONTROL, 2016, 67 : 1845 - 1850
  • [27] Influence of the Construction Risks on the Cost and Duration of a Project
    Lapidus, Azariy
    Topchiy, Dmitriy
    Kuzmina, Tatyana
    Chapidze, Otari
    [J]. BUILDINGS, 2022, 12 (04)
  • [28] Under the Mode of Project Construction Cost Control
    Gou Jingxiu
    Lu Jianchang
    [J]. PROCEEDINGS OF THE 8TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CSR: TOURISM, MICE, HOSPITALITY MANAGEMENT AND EDUCATION SESSION, PT II, 2012, : 190 - +
  • [29] Cost Control research in Construction Project Management
    Wang, Danjing
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 25 : 439 - 443
  • [30] Research on bidding threshold cost of construction project
    Liu, Jianbing
    Wu, Mingli
    [J]. PROCEEDINGS OF FIRST INTERNATIONAL CONFERENCE OF MODELLING AND SIMULATION, VOL IV: MODELLING AND SIMULATION IN BUSINESS, MANAGEMENT, ECONOMIC AND FINANCE, 2008, : 310 - 314