Prediction of Total Cost of Construction Project with Dependent Cost Items

被引:28
|
作者
Firouzi, Afshin [1 ]
Yang, Wei [2 ]
Li, Chun-Qing [3 ]
机构
[1] Islamic Azad Univ, Fac Engn, Sci & Res Branch, Construct Engn & Management Grp, Tehran 1477893855, Iran
[2] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[3] RMIT Univ, Sch Civil Environm & Chem Engn, Melbourne, Vic 3000, Australia
基金
澳大利亚研究理事会;
关键词
Probability distribution; Cost items; Monte Carlo simulation; Copula; Dependence structure; Cost and schedule; COPULA;
D O I
10.1061/(ASCE)CO.1943-7862.0001194
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects are typically carried out in highly uncertain environments with the risk of cost and time overruns, and subsequent disputes between stakeholders. One of common risk factors is that most cost items of a project are dependent random variables. Thus, correlations between basic cost items need to be considered in predicting the total cost of the project. This paper intends to propose a generic copula-based Monte Carlo simulation method for prediction of construction projects' total costs with dependent cost items. An algorithm to generate the joint probability distribution function of correlated cost items is developed and two examples are presented to demonstrate the applicability of copulas in modeling construction costs as random variables. A merit of the proposed method is that it not only can incorporate all different types of distributions in one framework, but it also captures the best dependence structure between variables. This paper finds that different dependence structures can lead to different probability distributions of total cost. It also finds that the existing goodness of fit tests can be employed in choosing the best performing copula. The paper concludes that the copula-based Monte Carlo simulation method can predict total cost of construction projects with reasonable accuracy.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Research on the total cost factors of construction project
    Zhu Xianghua
    Liu Yisheng
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 262 - 266
  • [2] Discussion on Objective-cost Planning for Construction Project Objective -Total Cost Management
    Nie, Shumin
    Liu, Junyan
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2323 - +
  • [3] PROJECT COST PREDICTION
    CLEAVENGER, R
    [J]. CME-CHARTERED MECHANICAL ENGINEER, 1984, 31 (01): : 15 - 15
  • [4] PROJECT COST PREDICTION
    ECCLESTON, WH
    [J]. CME-CHARTERED MECHANICAL ENGINEER, 1983, 30 (06): : 39 - 40
  • [5] PROJECT COST PREDICTION
    CLEAVENGER, R
    [J]. CME-CHARTERED MECHANICAL ENGINEER, 1984, 31 (04): : 13 - 13
  • [6] Construction Project Cost Prediction Method Based on Improved BiLSTM
    Wang, Chaoxue
    Qiao, Jiale
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (03):
  • [7] Research on Construction Cost Control of Contestable Measure Items - Taking a project in Shijiazhuang as an example
    Yu, Xiangmei
    Xie, Zhenbin
    Cao, Lijun
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2555 - +
  • [8] CONSTRUCTION PROJECT COST MANAGEMENT
    Sachek, P., V
    [J]. SCIENCE & TECHNIQUE, 2010, (05): : 72 - 78
  • [9] Study on Objective-total Cost Management Mode of Construction Project
    Nie, Shu-Min
    Ren, Feng
    Liu, Xiao-Liang
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 603 - 607
  • [10] Establishment of prediction system for cost of defect liability phase in construction project
    Nouh, Ahmed
    Elkasaby, Elsayed
    Hussein, Khaled
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (02): : 467 - 486