Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time

被引:41
|
作者
Yang, Suh-Jenq [1 ]
机构
[1] Nan Kai Univ Technol, Dept Ind Engn & Management, Nan Tou 542, Taiwan
关键词
Scheduling; Unrelated parallel machines; Deterioration effect; Deteriorating multi-maintenance activities; Total completion time; SINGLE-MACHINE; AVAILABILITY CONSTRAINT; MAKESPAN; JOBS;
D O I
10.1016/j.apm.2012.07.029
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates scheduling problems with simultaneous considerations of deterioration effects and deteriorating multi-maintenance activities on unrelated parallel machines. We examine two models of scheduling with the deterioration effect, namely the job-dependent and position-dependent deterioration model and the time-dependent deterioration model. We assume that each machine may be subject to several maintenance activities over the scheduling horizon, and the duration of maintenance on a machine depends on its running time. Moreover, due to the restriction of the budget of maintenance, the upper bound of the total maintenance frequencies on all the machines is assumed to be known in advance. The objective is to find jointly the optimal maintenance frequencies, the optimal maintenance positions, and the optimal job sequences such that the total completion time is minimized. If the number of machines is fixed, we introduce polynomial time solutions for all the versions of the problem under study. (C) 2012 Elsevier Inc. All rights reserved.
引用
收藏
页码:2995 / 3005
页数:11
相关论文
共 50 条
  • [21] Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time
    Miao, Cuixia
    Kong, Fanyu
    Zou, Juan
    Ma, Ran
    Huo, Yujia
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (01)
  • [22] Parallel-machine batching and scheduling to minimize total completion time
    The Hong Kong Polytechnic Univ, Kowloon, Hong Kong
    [J]. IIE Trans, 11 (953-956):
  • [23] Parallel-machine batching and scheduling to minimize total completion time
    Cheng, TCE
    Chen, ZL
    Kovalyov, MY
    Lin, BMT
    [J]. IIE TRANSACTIONS, 1996, 28 (11) : 953 - 956
  • [24] Parallel-Machine Scheduling with Delivery Times and Deteriorating Maintenance
    Ma, Wei-Min
    Sun, Li
    Liu, S. C.
    Wu, T. H.
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (04)
  • [25] Multi-machine scheduling with deterioration effects and maintenance activities for minimizing the total earliness and tardiness costs
    Hsin-Tao Lee
    Dar-Li Yang
    Suh-Jenq Yang
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 66 : 547 - 554
  • [26] Multi-machine scheduling with deterioration effects and maintenance activities for minimizing the total earliness and tardiness costs
    Lee, Hsin-Tao
    Yang, Dar-Li
    Yang, Suh-Jenq
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4): : 547 - 554
  • [27] Parallel-machine Scheduling with General Positional Deterioration and Maintenance
    Wang, Shijin
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1223 - 1227
  • [28] Scheduling to a common due date on unrelated parallel-machine with deteriorating jobs
    Hsu, Chou-Jung
    [J]. ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 521 - 527
  • [29] Single-machine scheduling to minimize makespan with deterioration jobs and multi-maintenance activities
    Hsu, Chou-Jung
    Chen, Hung-Chi
    [J]. MATERIAL DESIGN, PROCESSING AND APPLICATIONS, PARTS 1-4, 2013, 690-693 : 3007 - 3013
  • [30] Parallel-machine scheduling with linear deteriorating jobs and preventive maintenance activities under a potential machine disruption
    Zhang, Xingong
    Liu, Shang-Chia
    Lin, Win-Chin
    Wu, Chin-Chia
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 145 (145)