On a heuristic for the final exam scheduling problem

被引:0
|
作者
Weitz, RR [1 ]
Lakshminarayanan, S [1 ]
机构
[1] INDIAN STAT INST,NEW DELHI 110016,INDIA
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:599 / 600
页数:2
相关论文
共 50 条
  • [41] Heuristic method for solving PDP scheduling problem
    Lu, Rui
    Wang, Cheng-En
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2009, 30 (05): : 628 - 631
  • [42] On heuristic solutions for the stochastic flowshop scheduling problem
    Framinan, Jose M.
    Perez-Gonzalez, Paz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 413 - 420
  • [43] Heuristic Based Scheduling for Toothpaste Filling Problem
    Promjun, S.
    Jarumaneeroj, P.
    INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN INDUSTRIAL ENGINEERING AND MANUFACTURING, 2019, 530
  • [44] A New Heuristic Approach For Vehicle Scheduling Problem Combined With Aspects From Driver Scheduling Problem
    Oughalime, Ahmed
    Zirour, Mourad
    Ismail, Wan Rosmanira
    4TH INTERNATIONAL CONFERENCE ON QUANTITATIVE SCIENCES AND ITS APPLICATIONS (ICOQSIA 2016), 2016, 1782
  • [45] NOTES FOR A FINAL EXAM
    SOUTH, D
    JOURNAL OF HUMANISTIC PSYCHOLOGY, 1984, 24 (03) : 5 - 38
  • [46] The real final exam
    Coffey, DS
    PROSTATE, 1999, 39 (04): : 323 - 325
  • [47] Miss the final exam
    杰森
    姚莉力
    课外语文, 2004, (03) : 54 - 54
  • [48] Research on Multitask Collaborative Scheduling Problem with Heuristic Strategies
    FanZhang
    GuifaTeng
    JianbinMa
    JieYao
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 758 - +
  • [49] HEURISTIC PROGRAMMING SOLUTION OF A FLOWSHOP-SCHEDULING PROBLEM
    KRONE, MJ
    STEIGLIT.K
    OPERATIONS RESEARCH, 1974, 22 (03) : 629 - 638
  • [50] Optimal and heuristic solutions for a scheduling problem arising in a foundry
    Nonås, SL
    Olsen, KA
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (09) : 2351 - 2382