Experimental and numerical analyses on working performance of a high arch dam with deep-seated joints: Yebatan arch dam, China

被引:6
|
作者
Zhang, Wen [1 ]
Chen, Yuan [1 ]
Yang, Bao-quan [1 ]
Zhang, Lin [1 ]
Zhang, Chong [2 ]
Liu, Xiao-qiang [2 ]
机构
[1] Sichuan Univ, Coll Water Resources & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu 610065, Sichuan, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Deep-seated joint; Geomechanical model test; Numerical analysis; Yebatan arch dam; Working performance; Reinforcement measure; GEOMECHANICAL MODEL TEST; STABILITY ANALYSIS; GRAVITY DAM; FAILURE; REINFORCEMENT;
D O I
10.1007/s12517-019-4256-9
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
High arch dams commonly face complicated geological conditions at the dam site, which is particularly prominent in numerous projects in the southwest mountainous area of China. The deep-seated joint is a special geological defect caused by unloading fracturing of the deep rock mass, which is unfavourable to the working performance of high arch dam projects. The Yebatan arch dam is a world-class high arch dam, situated in a deeply carved V-shaped gorge with deep-seated joint zones in both banks. In this paper, both geomechanical model test and numerical analysis are carried out to study the working performance of the Yebatan arch dam and abutment, which are affected by the deep-seated joint zones. The research results demonstrate that the deep-seated joint zones have a significant effect on the arch dam and abutment working performance. It is highly dependent on the location of the class IVS strong relaxed rock mass and the combination with faults. The class IVS strong relaxed rock mass in the left abutment has a great impact on the deformation of arch dam and abutment, and fault f29 (f74) plays a dominant role in controlling the anti-sliding stability of the right abutment. Subsequently, a kind of concrete replacement measure is proposed in order to treat these project weaknesses. The additional numerical analysis results indicate the deformation and stability performance of arch dam and abutment are greatly improved after reinforced. The reinforcement measure is effective for Yebatan project.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Simulation of influence of multi-defects on long-term working performance of high arch dam
    GuoXin Zhang
    Yi Liu
    CuiYing Zheng
    Fan Feng
    Science China Technological Sciences, 2011, 54 : 1 - 8
  • [32] Performance of the Inducing Joints in Xiaowan Arch Dam with Reservoir Impounded to Normal Water Level
    Lu, Zhengchao
    Li, Libing
    Shang, Feng
    Jiang, Yunhui
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 511 - 520
  • [33] Simulation of influence of multi-defects on long-term working performance of high arch dam
    Zhang GuoXin
    Liu Yi
    Zheng CuiYing
    Feng Fan
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2011, 54 : 1 - 8
  • [34] Simulation of influence of multi-defects on long-term working performance of high arch dam
    ZHANG GuoXin
    China Institute of Water Resources and Hydropower Research
    Science China Technological Sciences, 2011, (S1) : 1 - 8
  • [35] The Numerical Calculation of Vibration Frequency of High Arch Dam Structure on the Condition of Earthquake
    Zhang, Ke Feng
    Cao, Zhi Xiang
    Xia, Zheng Bing
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2188 - +
  • [37] Static and dynamic analyses of abutment stability and dam cracking of a roller-compacted concrete high-arch dam
    Xiao Zhen-zhen
    Wang Deng-yin
    Chen Jian-ye
    Yang Bao-quan
    Zhang Lin
    ROCK AND SOIL MECHANICS, 2015, 36 (12) : 3541 - +
  • [38] Numerical Investigation into Underwater Explosion-Resistant Performance of an Arch Dam Considering Its Transverse Contraction and Control Joints
    Zhang, Qi-Ling
    Li, Duan-You
    Hu, Chao
    Hu, Lei
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (06)
  • [39] Dynamic behaviour of an arch dam-foundation-reservoir system: Experimental and numerical study
    Camara, RC
    Oliveira, SB
    STRUCTURAL DYNAMICS, VOLS. 1 & 2, 1996, : 703 - 709
  • [40] Study on working performance evaluation of the high arch dam of Dagangshan hydropower station during the initial impoundment period
    Ma K.
    Wang L.
    Zhuang D.
    Long L.
    Zhang G.
    Lv P.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 (09): : 1776 - 1785