Experimental and numerical analyses on working performance of a high arch dam with deep-seated joints: Yebatan arch dam, China

被引:6
|
作者
Zhang, Wen [1 ]
Chen, Yuan [1 ]
Yang, Bao-quan [1 ]
Zhang, Lin [1 ]
Zhang, Chong [2 ]
Liu, Xiao-qiang [2 ]
机构
[1] Sichuan Univ, Coll Water Resources & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu 610065, Sichuan, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Deep-seated joint; Geomechanical model test; Numerical analysis; Yebatan arch dam; Working performance; Reinforcement measure; GEOMECHANICAL MODEL TEST; STABILITY ANALYSIS; GRAVITY DAM; FAILURE; REINFORCEMENT;
D O I
10.1007/s12517-019-4256-9
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
High arch dams commonly face complicated geological conditions at the dam site, which is particularly prominent in numerous projects in the southwest mountainous area of China. The deep-seated joint is a special geological defect caused by unloading fracturing of the deep rock mass, which is unfavourable to the working performance of high arch dam projects. The Yebatan arch dam is a world-class high arch dam, situated in a deeply carved V-shaped gorge with deep-seated joint zones in both banks. In this paper, both geomechanical model test and numerical analysis are carried out to study the working performance of the Yebatan arch dam and abutment, which are affected by the deep-seated joint zones. The research results demonstrate that the deep-seated joint zones have a significant effect on the arch dam and abutment working performance. It is highly dependent on the location of the class IVS strong relaxed rock mass and the combination with faults. The class IVS strong relaxed rock mass in the left abutment has a great impact on the deformation of arch dam and abutment, and fault f29 (f74) plays a dominant role in controlling the anti-sliding stability of the right abutment. Subsequently, a kind of concrete replacement measure is proposed in order to treat these project weaknesses. The additional numerical analysis results indicate the deformation and stability performance of arch dam and abutment are greatly improved after reinforced. The reinforcement measure is effective for Yebatan project.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Experimental and numerical analyses on working performance of a high arch dam with deep-seated joints: Yebatan arch dam, China
    Wen Zhang
    Yuan Chen
    Bao-quan Yang
    Lin Zhang
    Chong Zhang
    Xiao-qiang Liu
    Arabian Journal of Geosciences, 2019, 12
  • [2] Characteristics of deep-seated crack in dam site of Yebatan Hydropower Station
    Liu L.-J.
    Zhao Q.-H.
    Han G.
    Zhao, Qi-Hua (zhqh@cdut.edu.cn), 1600, Chinese Society of Civil Engineering (39): : 501 - 508
  • [3] Effect of deep unloading zone on working performance of arch dam and abutment: A case study in the Yebatan Hydropower Station
    Zhang, Wen
    Chen, Yuan
    Zhang, Lin
    Yang, Bao-quan
    Zhang, Chong
    Liu, Xiao-qiang
    DEEP ROCK MECHANICS: FROM RESEARCH TO ENGINEERING, 2019, : 609 - 619
  • [4] Experimental and numerical investigation on the stability of a high arch dam with typical problems of nonsymmetry: Baihetan Dam, China
    Ziheng Song
    Yaoru Liu
    Qiang Yang
    Bulletin of Engineering Geology and the Environment, 2016, 75 : 1555 - 1570
  • [5] Experimental and numerical investigation on the stability of a high arch dam with typical problems of nonsymmetry: Baihetan Dam, China
    Song, Ziheng
    Liu, Yaoru
    Yang, Qiang
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2016, 75 (04) : 1555 - 1570
  • [6] EFFECT OF CONTRACTION JOINTS ON THE STRUCTURAL PERFORMANCE OF ARCH DAM
    Khassaf, Saleh Issa
    Chkheiwr, Aqeel
    Jasim, Mohammed Abdulrahim
    INTERNATIONAL JOURNAL OF GEOMATE, 2020, 19 (71): : 219 - 227
  • [7] Numerical modeling of aseismic reinforcement between contraction joints in high arch dam
    Guo, Yonggang
    Sun, Wuji
    Liu, Xianliang
    Yingyong Lixue Xuebao/Chinese Journal of Applied Mechanics, 2007, 24 (01): : 16 - 20
  • [9] Study on real working performance and overload safety factor of high arch dam
    Zhang GuoXin
    Liu Yi
    Zhou QuJing
    SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2008, 51 (Suppl 2): : 48 - 59
  • [10] Study on real working performance and overload safety factor of high arch dam
    GuoXin Zhang
    Yi Liu
    QiuJing Zhou
    Science in China Series E: Technological Sciences, 2008, 51 : 48 - 59