Pipelines install new buoyancy control system

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
引用
收藏
页码:56 / 57
页数:2
相关论文
共 50 条
  • [21] Energy Analysis and Buoyancy Compensation Design for A New Underwater Glider Buoyancy-driven System
    Ren, Muhua
    Xu, Jiawei
    Yang, Ming
    Wang, Cheng
    Yang, Shaoqiong
    OCEANS 2024 - SINGAPORE, 2024,
  • [22] APP to install new paper machines
    Orgill, B
    TAPPI JOURNAL, 1997, 80 (09): : 32 - 32
  • [23] Solvay to install water recycling system
    Official Board Markets, 2002, 78 (43):
  • [24] Optimization of buoyancy of an articulated stinger on submerged pipelines laid with a barge
    Zhu, DS
    Cheung, YK
    OCEAN ENGINEERING, 1997, 24 (04) : 301 - 311
  • [25] Mondi to install new eucalyptus line
    PPI This Week, 2003, 18 (12):
  • [26] EMP and Masterbulk Install New Battery
    Motor Ship, 2019, 100 (1166):
  • [27] Chuetsu to install new DIP line
    Fujiwara, H
    TAPPI JOURNAL, 1999, 82 (04): : 36 - 36
  • [28] To install new packaging paper PM
    2000, Miller Freeman Inc, San Francisco, CA, United States (20):
  • [29] Automated Buoyancy Control System for a Remotely Operated Underwater Crawler
    Wood, Stephen L.
    Hendricks, Arne
    Corbet, Michael
    OCEANS 2015 - GENOVA, 2015,
  • [30] Mondi to install new containerboard machine
    PPI This Week, 2007, 22 (01):