共 50 条
- [1] DEVELOPMENT OF CONTROLLED BUOYANCY SYSTEM FOR INSTALLATION OF SUBMERGED PIPELINES JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1977, 69 (04): : 214 - 218
- [2] HOW TO INSTALL A MANAGEMENT INFORMATION AND CONTROL SYSTEM SYSTEMATICS, 1966, 17 (05): : 10 - 14
- [3] UPGRADING A SYSTEM BUBBLER - ADD ON OR INSTALL NEW WATER-ENGINEERING & MANAGEMENT, 1991, 138 (11): : 29 - 31
- [5] ANALYTICAL FORMULATION OF DISTRIBUTED BUOYANCY SECTIONS TO CONTROL LATERAL BUCKLING OF SUBSEA PIPELINES PROCEEDINGS OF THE ASME 29TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING 2010, VOL 5, PTS A AND B, 2010, : 669 - 677
- [9] Russia: NLMK to install shape control system for a tandem line STAHL UND EISEN, 2006, 126 (11): : S12 - S12