共 50 条
- [43] TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 305 - 310
- [45] Prediction Based on Support Vector Machine for Travel Choice of High-Speed Railway Passenger in China [J]. 2011 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING - 18TH ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2011, : 28 - +
- [46] Highway Passenger Travel Demand Forecasting under the Development of High-Speed Railway [J]. CICTP 2021: ADVANCED TRANSPORTATION, ENHANCED CONNECTION, 2021, : 2213 - 2220
- [47] Research on High-speed Railway Floating Pricing Strategy Based on Passenger Travel Behavior Characteristics [J]. Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (06): : 11 - 17
- [48] The prospect of high-speed transportation system on Beijing-Shanghai corridor [J]. TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 218 - 225
- [49] The Intelligent Brain of the Passenger Station for China Railway High-Speed (CRH) [J]. PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 3733 - 3737
- [50] The Intelligent Beijing-Zhangjiakou High-Speed Railway [J]. Engineering, 2021, (12) : 1665 - 1672