共 50 条
- [21] Seepage analysis of the fractured rock mass in the foundation of the main dam of the Xiaolangdi water control project Environmental Earth Sciences, 2015, 74 : 4453 - 4468
- [23] Calculation of earth-rock dam seepage based on boundary element method with the infinitely deep permeable foundation ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 241 - 244
- [25] Detection of Seepage Path of dam foundation Based on Groundvue Radar PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2015), 2016, 44 : 459 - 462
- [26] Inverse analysis of seepage parameters for dam foundation of a hydropower station Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (20): : 3766 - 3770
- [27] BACK ANALYSIS OF SEEPAGE PARAMETERS OF HIGH ARCH DAM FOUNDATION PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 349 - +
- [28] AMBIENT-TEMPERATURE EFFECT IN CONCRETE DAM FOUNDATION SEEPAGE JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1992, 118 (01): : 1 - 11
- [29] The Design of the Sewage Device in Seepage Monitoring Instrument for Dam Foundation ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1128 - 1131