Identification of run-of-river hydropower investments in data scarce regions using global data

被引:9
|
作者
Magaju, Dipendra [1 ,2 ]
Cattapan, Alessandro [1 ]
Franca, Mario [1 ,3 ]
机构
[1] IHE Delft, Inst Water Educ, Delft, Netherlands
[2] Univ Auckland, Dept Civil & Environm Engn, Auckland, New Zealand
[3] Delft Univ Technol, Dept Hydraul Engn, Delft, Netherlands
关键词
Hydropower potential; Data scarce regions; Hydrological model; Hydropower model; West Rapti basin; FLOW DURATION CURVES; DISTRIBUTIONS; REGIME; PLANTS; MODEL;
D O I
10.1016/j.esd.2020.07.001
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The increase in economic activities, population and rural electrification has significantly increased the energy demand in most of the developing nations. This demand has to be supplied from various sources, preferably renewable, among which hydropower is expected to be one of the major contributors. Though developed nations have already harnessed most of their hydropower potential, developing nations are still struggling in project identification and capacity assessment, mainly due to lack of data and difficulties of access. We present and test an assessment framework, developed for data scarce regions, to identify optimal location and installed capacity of multiple run-of-river hydropower projects within a river basin. The developed framework consists of two components: the first component is a hydrological model for flow duration curves, the second component is a so-called hydropower model. Flow duration curves are obtained using an existing probabilistic hydrological model which derives the probability distribution of streamflow as a function of few topographic and climatic parameters. A novel optimization procedure is developed, where viable hydropower projects are identified minimizing their specific cost, which depends mainly on discharge, head and length of conduit system. We tested the assessment framework in the West Rapti basin (Nepal). The application showed that the total potential of this basin maybe achieved with 79 different projects with capacity ranging from 1 to 17 MW. The framework was developed using open languages and software and can therefore be freely used after request to the corresponding author. (C) 2020 International Energy Initiative. Published by Elsevier Inc. All rights reserved.
引用
收藏
页码:30 / 41
页数:12
相关论文
共 50 条
  • [31] Current and Future Environmental Balance of Small-Scale Run-of-River Hydropower
    Gallagher, John
    Styles, David
    McNabola, Aonghus
    Williams, A. Prysor
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2015, 49 (10) : 6344 - 6351
  • [32] LCOE-Based Optimization for the Design of Small Run-of-River Hydropower Plants
    Amougou, Claude Boris
    Tsuanyo, David
    Fioriti, Davide
    Kenfack, Joseph
    Aziz, Abdoul
    Abiama, Patrice Ele
    ENERGIES, 2022, 15 (20)
  • [33] Analysis of implications of a regulation on design discharge of run-of-river hydropower projects in Nepal
    Bhattarai, Saroj Babu
    Shrestha, Ram M.
    SUSTAINABLE WATER RESOURCES MANAGEMENT, 2023, 9 (03)
  • [34] Water Quality Analysis: Ecological Integrity Conformance of Run-of-River Hydropower Plants
    Macabiog, Rose Ellen N.
    Dela Cruz, Jennifer C.
    Amado, Timothy
    2018 IEEE 10TH INTERNATIONAL CONFERENCE ON HUMANOID, NANOTECHNOLOGY, INFORMATION TECHNOLOGY, COMMUNICATION AND CONTROL, ENVIRONMENT AND MANAGEMENT (HNICEM), 2018,
  • [35] Run-of-river Power Plant Sohlstufe Lehen - Hydropower within Urban Areas
    Pfisterer, Martin
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 65 - 70
  • [36] Modeling Hydrodynamic Changes Induced by Run-of-River Hydropower Plants along the Prahova River in Romania
    Nistoran, Daniela Elena Gogoase
    Ionescu, Cristina Sorana
    Brasoveanu, Livioara
    Armas, Iuliana
    Opris, Ioana
    Costinas, Sorina
    JOURNAL OF ENERGY ENGINEERING, 2018, 144 (02)
  • [37] Development of evaluation framework for the selection of run-of-river hydropower potential sites to be included in the Zambian Hydropower Atlas
    Mudenda, Frank
    Van Dijk, Marco
    Bekker, Anja
    JOURNAL OF WATER AND CLIMATE CHANGE, 2022, 13 (11) : 4000 - 4018
  • [38] Verification of a robust method for sizing and siting the small hydropower run-of-river plant potential by using GIS
    Tamm, Ottar
    Tamm, Toomas
    RENEWABLE ENERGY, 2020, 155 : 153 - 159
  • [39] Run-of-river hydropower in the UK and Ireland: the case for abstraction licences based on future flows
    Dallison, Richard J. H.
    Patil, Sopan D.
    ENVIRONMENTAL RESEARCH: INFRASTRUCTURE AND SUSTAINABILITY, 2023, 3 (04):
  • [40] Quantification of run-of-river hydropower potential in the Upper Indus basin under climate change
    Dhaubanjar, Sanita
    Lutz, Arthur F.
    Smolenaars, Wouter Julius
    Khanal, Sonu
    Jamil, Muhammad Khalid
    Biemans, Hester
    Ludwig, Fulco
    Shrestha, Arun Bhakta
    Immerzeel, Walter W.
    FRONTIERS IN WATER, 2023, 5