Numerical Investigation of the Dynamic Mechanical State of a Coal Pillar During Longwall Mining Panel Extraction

被引:116
|
作者
Wang, Hongwei [1 ]
Jiang, Yaodong [1 ,2 ]
Zhao, Yixin [1 ,2 ]
Zhu, Jie [1 ]
Liu, Shuai [1 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] State Key Lab Coal Resources & Safe Min, Beijing 100083, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Coal bump; Coal pillar; Elastic core; Longwall panel; Bump-prone zones; FLAC(3D); DESIGN; STABILITY; STRENGTH;
D O I
10.1007/s00603-012-0337-8
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This study presents a numerical investigation on the dynamic mechanical state of a coal pillar and the assessment of the coal bump risk during extraction using the longwall mining method. The present research indicates that there is an intact core, even when the peak pillar strength has been exceeded under uniaxial compression. This central portion of the coal pillar plays a significant role in its loading capacity. In this study, the intact core of the coal pillar is defined as an elastic core. Based on the geological conditions of a typical longwall panel from the Tangshan coal mine in the City of Tangshan, China, a numerical fast Lagrangian analysis of continua in three dimensions (FLAC(3D)) model was created to understand the relationship between the volume of the elastic core in a coal pillar and the vertical stress, which is considered to be an important precursor to the development of a coal bump. The numerical results suggest that, the wider the coal pillar, the greater the volume of the elastic core. Therefore, a coal pillar with large width may form a large elastic core as the panel is mined, and the vertical stress is expected to be greater in magnitude. Because of the high stresses and the associated stored elastic energy, the risk of coal bumps in a coal pillar with large width is greater than for a coal pillar with small width. The results of the model also predict that the peak abutment stress occurs near the intersection between the mining face and the roadways at a distance of 7.5 m from the mining face. It is revealed that the bump-prone zones around the longwall panel are within 7-10 m ahead of the mining face and near the edge of the roadway during panel extraction.
引用
收藏
页码:1211 / 1221
页数:11
相关论文
共 50 条
  • [21] A particle-based numerical investigation on longwall top coal caving mining
    Zhengyang Song
    Heinz Konietzky
    Arabian Journal of Geosciences, 2019, 12
  • [22] Investigation on mechanism of energy explosion during extraction of island longwall panel
    Wang, Hongwei
    Jiang, Yaodong
    Zhao, Yixin
    Liu, Shuai
    Gao, Renjie
    Wang, H. (whw@cumtb.edu.cn), 1600, Academia Sinica (32): : 2250 - 2257
  • [23] Exploration and Numerical Analysis of Failure Characteristic of Coal Pillar Under Great Mining Height Longwall Influence
    Wang, Jun
    Jiang, Jinquan
    Li, Guangbo
    Hu, Hao
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2016, 34 (02) : 689 - 702
  • [24] Impact of longwall mining on groundwater above the longwall panel in shallow coal seams
    Yang Li
    Syd S.Peng
    Jinwang Zhang
    Journal of Rock Mechanics and Geotechnical Engineering, 2015, 7 (03) : 298 - 305
  • [25] A physical and numerical modelling investigation of the roadway stability in longwall mining, with and without narrow pillar protection
    Yavuz, H
    Fowell, RJ
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (01): : A59 - A72
  • [26] Experimental study on the interrelation of multiple mechanical parameters in overburden rock caving process during coal mining in longwall panel
    Deng, Daixin
    Wang, Hongwei
    Xie, Lili
    Wang, Zeliang
    Song, Jiaqi
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2023, 10 (01)
  • [27] Experimental study on the interrelation of multiple mechanical parameters in overburden rock caving process during coal mining in longwall panel
    Daixin Deng
    Hongwei Wang
    Lili Xie
    Zeliang Wang
    Jiaqi Song
    International Journal of Coal Science & Technology, 2023, 10
  • [28] Investigating Effect of Induced Stresses due to Coal Panel Extraction on Next Panel Strata behavior during Mechanized Longwall Mining: a Case Study
    Ardehjani, Emad Ansari
    Rafiee, Ramin
    Ataei, Mohammad
    JOURNAL OF MINING AND ENVIRONMENT, 2024, 15 (01): : 381 - 399
  • [29] Numerical modeling for longwall pillar design: a case study from a typical longwall panel in China
    Zhang, Guangchao
    Liang, Saijiang
    Tan, Yunliang
    Xie, Fuxing
    Chen, Shaojie
    Jia, Hongguo
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2018, 15 (01) : 121 - 134
  • [30] Examining the optimum panel pillar dimension in longwall mining considering stress distribution
    Yetkin, Mustafa Emre
    Ozfirat, Muharrem Kemal
    Onargan, Turgay
    SCIENTIFIC REPORTS, 2024, 14 (01)