Utilizing artificial intelligence to solving time - cost - quality trade-off problem

被引:10
|
作者
Pham Vu Hong Son [1 ]
Luu Ngoc Quynh Khoi [1 ]
机构
[1] Ho Chi Minh City Univ Technol HCMUT, Construct Engn & Management Dept, Vietnam Natl Univ, 268 Ly Thuong Kiet St,Dist 10, Ho Chi Minh City 700000, Vietnam
关键词
MULTIOBJECTIVE OPTIMIZATION; DIFFERENTIAL EVOLUTION; PROJECTS;
D O I
10.1038/s41598-022-24668-7
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This study presents the Slime Mold Algorithm (SMA) to solve the time-cost-quality trade-off problem in a construction project. The proposed SMA is a flexible and efficient algorithm in exploration and exploitation to reach the best optimal solution to process the input model's data. This paper aims to discuss and solve the optimization problem and compare the evaluation with other algorithms such as Opposition-based Multiple Objective Differential Evolution, Non-dominated sorting genetic algorithm, Multiple objective particle swarm optimization, Multiple objective differential evolution and Chaotic initialized multiple objective differential evolution (CAMODE) to verify the efficiency and potential of the proposed algorithm. According to the analysis results, the SMA model generated a diversification measure for case studies, producing superior outcomes to those of previous algorithms.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Utilizing artificial intelligence to solving time – cost – quality trade-off problem
    Pham Vu Hong Son
    Luu Ngoc Quynh Khoi
    [J]. Scientific Reports, 12
  • [2] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [3] Multiple objective immune wolf colony algorithm for solving time-cost-quality trade-off problem
    Liu, Guanyi
    Li, Xuemei
    Alam, Khalid Mehmood
    [J]. PLOS ONE, 2023, 18 (02):
  • [4] Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem
    Jeunet, Jully
    Orm, Mayassa Bou
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 284 (02) : 743 - 761
  • [5] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    [J]. PLOS ONE, 2016, 11 (12):
  • [6] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [7] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    [J]. ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [8] Hybrid time-quality-cost trade-off problems
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 306 - 318
  • [9] Trade-off between quality and cost
    Huang, YF
    [J]. QUALITY & QUANTITY, 2001, 35 (03) : 265 - 276
  • [10] Trade-off between Quality and Cost
    Ying-Fang Huang
    [J]. Quality and Quantity, 2001, 35 : 265 - 276