Calculation for settlement of high cap extra-long large diameter pile groups

被引:1
|
作者
Deng, Yousheng [1 ]
Zheng, Jianqiang [1 ]
Wan, Changzhong [1 ]
He, Shaohua [1 ]
机构
[1] Hubei Univ Technol, Sch Civil Engn & Architecture, Wuhan 430068, Peoples R China
关键词
extra-long large diameter pile groups; high cap; ratio of pile end resistance to pile top load; pile compression; settlement;
D O I
10.4028/www.scientific.net/AMM.178-181.2171
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The settlement of high cap extra-long large diameter pile groups is made up of pile elastic compression and settlement of soil layers under pile end in theory. Methods to calculate pile compression of high cap extra-long large diameter pile groups was deduced or listed. Six methods to calculate settlement of soil layers under pile end were expounded through extra-long large diameter pile groups under south tower of main bridge of Sutong Yangtse River Highway Bridges. The results show that piles' elastic compression should be calculated into the settlement of extra-long large diameter pile groups, including that caused by pile's own weight, and it is little difference between test value and total settlement which is composed of piles' elastic compression calculated through the formula deduced in the paper and theoretic settlement of soil layers under pile end based on Mindlin's additional stress solution, only making 0.06% lower.
引用
收藏
页码:2171 / 2174
页数:4
相关论文
共 50 条
  • [41] Bearing capacity of super-long and large-diameter bored pile tip
    Cheng, Ye
    Gong, Weiming
    Dai, Guoliang
    Ji, Jie
    Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics and Astronautics, 2007, 39 (03): : 407 - 411
  • [42] Field Monitoring and Numerical Study on the Effects of Reclamation on Large-Diameter Long Pile
    X. Zhang
    S. Chen
    K. S. Wong
    Z. Lu
    R. Chen
    H. Lu
    Soil Mechanics and Foundation Engineering, 2022, 59 : 167 - 175
  • [43] Key techniques for the diffused oxygen supply of an extra-long highway tunnel in a high-altitude area
    Yan, Tao
    Wang, Mingnian
    Guo, Chun
    Chen, Hanbo
    Xie, Wenqiang
    Modern Tunnelling Technology, 2015, 52 (02) : 180 - 185
  • [44] Analysis on Differential Thermal Calculation Mode and Sunshine Temperature Difference Effect of Box Beam of the Extra-long Longtan River Bridge
    Yin, Canbin
    Yu, Fang
    2019 11TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2019), 2019, : 6 - 9
  • [45] Study on Calculation of Pile Sliding Interval of Large-Diameter Steel Pipe Piles on Offshore Platforms
    Kong, Desen
    Deng, Meixu
    Xu, Yu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [46] Performance and control of long-term settlement of pile group foundations for large wind turbines
    Ren, Yu
    Zhu, Bin
    Chen, Renpeng
    Wang, Zhenyu
    Chen, Yunmin
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (03): : 75 - 80
  • [47] Postanesthesia Patients With Large Upper Arm Circumference: Is Use of an "Extra-long" Adult Cuff or Forearm Cuff Placement Accurate?
    Watson, Sheri
    Aguas, Marita
    Bienapfl, Tracy
    Colegrove, Pat
    Foisy, Nancy
    Jondahl, Bonnie
    Yosses, Mary Beth
    Yu, Larissa
    Anastas, Zoe
    JOURNAL OF PERIANESTHESIA NURSING, 2011, 26 (03) : 135 - 142
  • [48] A practical method of calculation of bearing capacity and settlement of large-diameter post-grouting piles
    Wan Zhi-hui
    Dai Guo-liang
    Gao Lu-chao
    Gong Wei-ming
    ROCK AND SOIL MECHANICS, 2020, 41 (08) : 2746 - 2755
  • [49] Operating ventilation technology for diesel-hauled train crossing extra-long tunnels in high altitude plateau
    Sun, San-Xiang, 1600, Editorial Department of Journal of Railway Engineering Society, China (34):
  • [50] Parameter sensitivity of horizontal bearing capacity of large diameter and super-long bored pile
    Li Hong-jiang
    Tong Li-yuan
    Liu Song-yu
    Bao Hong-yan
    Yang Tao
    ROCK AND SOIL MECHANICS, 2018, 39 (05) : 1825 - 1833