共 50 条
- [1] Influence of joints on tunnel lining behaviour, second Heinenoord Tunnel TUNNELLING '97, 1997, : 11 - 27
- [2] Monitoring: Evaluation of stresses in the lining of the Second Heinenoord Tunnel GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 197 - 202
- [3] Displacement and Deformation of the First Tunnel Lining During the Second Tunnel Construction CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (02): : 332 - 339
- [4] Monitoring the second Heinenoord Tunnel and the Botlek Rail Tunnel GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 191 - 196
- [5] Second Heinenoord tunnel - The first bored tunnel in the Netherlands TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 411 - 416
- [8] Analysis of Ground Settlement during Shield Tunnel Construction in Soft Soil Soil Mechanics and Foundation Engineering, 2023, 60 : 134 - 140
- [9] Maintenance and conservation plan for the Second Heinenoord Tunnel STRAIT CROSSINGS 2001, 2001, : 495 - 498
- [10] The Second Heinenoord tunnel; The main monitoring results PROCEEDINGS OF THE FIFTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING VOLS 1-3, 2001, : 1445 - 1450