Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system

被引:66
|
作者
Bouslah, Bassem [1 ]
Gharbi, Ali [2 ]
Pellerin, Robert [1 ]
机构
[1] Ecole Polytech, Dept Math & Ind Engn, Montreal, PQ H3C 3A7, Canada
[2] Univ Quebec, Automated Prod Engn Dept, Prod Syst Design & Control Lab, Ecole Technol Super, Montreal, PQ H3C 1K3, Canada
关键词
Unreliable manufacturing systems; Acceptance sampling plan; Optimal lot sizing; Feedback control policy; Simulation; Response surface methodology; EXTENDED EMQ MODEL; PREVENTIVE MAINTENANCE; INTEGRATED INVENTORY; INSPECTION POLICIES; MACHINE; QUALITY; OPTIMIZATION; DESIGN;
D O I
10.1016/j.ijpe.2013.01.031
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with the problem of the joint determination of the optimal lot sizing and optimal production control policy for an unreliable and imperfect manufacturing system, where the quality control of lots produced is performed using an acceptance sampling plan. The proportion of defective items, the time between failures and the time to repair are generally distributed. The incurred total cost includes manufacturing cost, transportation cost, inspection costs, rejection cost of defective items, replacement cost for returned defective items from customers, and holding and backlog costs. The associated cost minimization problem is formulated with a stochastic dynamic programming model where the lot sizing and production rate are considered as decision variables. Given the difficulties in solving such a highly stochastic model analytically or numerically, we adopted a modified hedging point policy (HPP) to control the production rate, as well as an economic lot sizing policy for batch processing control; we also relied on a simulation-based experimental approach to determine a close approximation of the optimal control parameters. It is shown that production should be accelerated at the maximum production rate, not only when building the safety stock, as in the classical HPP, but also after rejecting a lot, in order to recuperate the loss in inventory and to maintain the on-hand safety stock. Numerical experiments and thorough sensitivity analyses are provided to illustrate the effectiveness of the proposed control policy and the robustness of the resolution approach. Some interesting behaviours regarding the impact of different parameters on the optimal decision variables are observed and discussed. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:143 / 156
页数:14
相关论文
共 50 条
  • [41] A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system
    Rafiee, K.
    Rabbani, M.
    Rafiei, H.
    Rahimi-Vahed, A.
    [J]. APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) : 1810 - 1819
  • [42] Production and subcontracting control for an unreliable manufacturing system with setups
    Assid, M.
    Gharbi, A.
    Hajji, A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (12) : 3570 - 3588
  • [43] Production lot sizing with the reworking of imperfect quality items produced
    Hayek, PA
    Salameh, MK
    [J]. PRODUCTION PLANNING & CONTROL, 2001, 12 (06) : 584 - 590
  • [44] Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
    Radhoui, M.
    Rezg, N.
    Chelbi, A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (02) : 389 - 402
  • [45] Lot sizing with a Markov production process and imperfect items scrapped
    Maddah, Bacel
    Moussawi, Lama
    Jaber, Mohamad Y.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 124 (02) : 340 - 347
  • [46] Threshold Control Policy for Maintainability of Manufacturing System with Unreliable Workstations
    Chandra Shekhar
    Madhu Jain
    Javid Iqbal
    Ather Aziz Raina
    [J]. Arabian Journal for Science and Engineering, 2017, 42 : 4833 - 4851
  • [47] Threshold Control Policy for Maintainability of Manufacturing System with Unreliable Workstations
    Shekhar, Chandra
    Jain, Madhu
    Iqbal, Javid
    Raina, Ather Aziz
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2017, 42 (11) : 4833 - 4851
  • [48] Optimal control structure of an unreliable manufacturing system with random demands
    Song, DP
    Sun, YX
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1999, 44 (03) : 619 - 622
  • [49] Optimal control structure of an unreliable manufacturing system with random demands
    Song, DP
    Sun, YX
    [J]. PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 4552 - 4557
  • [50] Integrated production-transshipment control policy for a two-location unreliable manufacturing system
    Dhahri, Akrem
    Gharbi, Ali
    Ouhimmou, Mustapha
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2022, 247