Risk assessment for construction projects of transport infrastructure objects

被引:0
|
作者
Titarenko, Boris [1 ]
机构
[1] Moscow State Civil Engn Univ, Dept Appl Math, Moscow, Russia
关键词
D O I
10.1088/1755-1315/90/1/012057
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Risk-Informed Performance Assessment of Construction Projects
    Papanikolaou, Merkourios
    Xenidis, Yiannis
    [J]. SUSTAINABILITY, 2020, 12 (13)
  • [42] The Geosynthetics for Sustainable Construction of Infrastructure Projects
    Karpurapu R.
    [J]. Indian Geotechnical Journal, 2017, 47 (01) : 2 - 34
  • [43] Risk Assessment and Allocation in Highway Construction Projects in the UAE
    El-Sayegh, Sameh M.
    Mansour, Mahmoud H.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [44] Risk Assessment of Construction Organization Plans for Bridge Projects
    Wang, Yuqian
    Bian, Guoyan
    Li, Yi
    [J]. ADVANCES IN CIVIL ENGINEERING AND BUILDING MATERIALS III, 2014, 831 : 370 - +
  • [45] ENTERPRISE'S RISK ASSESSMENT OF COMPLEX CONSTRUCTION PROJECTS
    Konior, J.
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2015, 61 (03) : 63 - 74
  • [46] Structural Network Measures for Risk Assessment of Construction Projects
    Govan, Paul
    Damnjanovic, Ivan
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2020, 6 (01)
  • [47] A REVIEW OF FUZZY RISK ASSESSMENT MODELS FOR CONSTRUCTION PROJECTS
    Rezakhani, P.
    [J]. SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (03) : 35 - 40
  • [48] Risk identification and assessment in sustainable construction projects in the UAE
    El-Sayegh, Sameh M.
    Manjikian, Solair
    Ibrahim, Ahmed
    Abouelyousr, Ahmed
    Jabbour, Raed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (04) : 327 - 336
  • [49] An expert system for risk assessment tools of construction projects
    Yang, ZH
    Zhou, C
    Zhang, ZY
    Zhao, JP
    Guo, JP
    Cui, XH
    Dong, JH
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL III, PTS A AND B, 2002, 3 : 1013 - 1016
  • [50] Cognitive Psychological Approach for Risk Assessment in Construction Projects
    Li, Nan
    Fang, Dongping
    Sun, Yu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)