Scheduling algorithms for conducting conflict-free measurements in overlay networks

被引:9
|
作者
Fraiwan, M. [1 ]
Manimaran, G. [1 ]
机构
[1] Iowa State Univ, Dept Elect & Comp Engn, Real Time Comp & Networking Lab, Ames, IA 50011 USA
关键词
Measurement scheduling; Overlay networks; Measurement conflict; Network monitoring;
D O I
10.1016/j.comnet.2008.06.006
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Network monitoring is essential to the correct and efficient operation of ISP networks and the kind of applications they support, and active measurement is a key design problem in network monitoring. Unfortunately, almost all active probing algorithms ignore the measurement conflict problem: Active measurements conflict with each other - due to the nature of these measurements, the associated overhead, and the network topology - which leads to reporting incorrect results. In this paper, we consider the problem of scheduling periodic QoS measurement tasks in overlay networks. We first show that this problem is NP-hard, and then propose two conflict-aware scheduling algorithms for uniform and non-uniform tasks whose goal is to maximize the number of measurement tasks that can run concurrently, based on a well-known approximation algorithm. We incorporate topological information to devise a topology-aware scheduling algorithm that reduces the number of time slots required to produce a feasible measurement schedule. Also, we study the conflict-causing overlap among overlay paths using various real-life Internet topologies of the two major service carriers in the US. Experiments conducted using the PlanetLab testbed confirm that measurement conflict is a real issue that needs to be addressed. Simulation results show that our algorithms achieve at least 25% better schedulability over an existing algorithm. Finally, we discuss various practical considerations, and identify several interesting research problems in this context. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:2819 / 2830
页数:12
相关论文
共 50 条
  • [31] LINEAR TIME ALGORITHMS FOR LIVENESS AND BOUNDEDNESS IN CONFLICT-FREE PETRI NETS
    ALIMONTI, P
    FEUERSTEIN, E
    NANNI, U
    LECTURE NOTES IN COMPUTER SCIENCE, 1992, 583 : 1 - 14
  • [32] Supporting conflict-free replicated data types in opportunistic networks
    Frédéric Guidec
    Yves Mahéo
    Camille Noûs
    Peer-to-Peer Networking and Applications, 2023, 16 : 395 - 419
  • [33] Supporting conflict-free replicated data types in opportunistic networks
    Guidec, Frederic
    Maheo, Yves
    Nous, Camille
    PEER-TO-PEER NETWORKING AND APPLICATIONS, 2023, 16 (01) : 395 - 419
  • [34] CONFLICT-FREE CONNECTIONS OF GRAPHS
    Czap, Julius
    Jendrol, Stanislav
    Valiska, Juraj
    DISCUSSIONES MATHEMATICAE GRAPH THEORY, 2018, 38 (04) : 911 - 920
  • [35] Conflict-free connection of trees
    Hong Chang
    Meng Ji
    Xueliang Li
    Jingshu Zhang
    Journal of Combinatorial Optimization, 2021, 42 : 340 - 353
  • [36] Conflict-Free Incremental Learning
    Sun, Rong-Lei
    EMERGING INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2009, 5755 : 618 - 626
  • [37] Energy-aware Integrated Scheduling for Container Terminals with Conflict-free AGVs
    Zhong, Zhaolin
    Guo, Yiyun
    Zhang, Jihui
    Yang, Shengxiang
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2023, 32 (04) : 413 - 443
  • [38] Conflict-free hypergraph matchings
    Glock, Stefan
    Joos, Felix
    Kim, Jaehoon
    Kuhn, Marcus
    Lichev, Lyuben
    JOURNAL OF THE LONDON MATHEMATICAL SOCIETY-SECOND SERIES, 2024, 109 (05):
  • [39] On conflict-free connection of graphs
    Chang, Hong
    Huang, Zhong
    Li, Xueliang
    Mao, Yaping
    Zhao, Haixing
    DISCRETE APPLIED MATHEMATICS, 2019, 255 : 167 - 182
  • [40] Energy-aware Integrated Scheduling for Container Terminals with Conflict-free AGVs
    Zhaolin Zhong
    Yiyun Guo
    Jihui Zhang
    Shengxiang Yang
    Journal of Systems Science and Systems Engineering, 2023, 32 : 413 - 443