共 50 条
- [1] Assessing the impact of changing available multiple process plans of a job type on mean tardiness in job shop scheduling The International Journal of Advanced Manufacturing Technology, 2015, 80 : 1521 - 1545
- [2] Assessing the impact of changing available multiple process plans of a job type on mean tardiness in job shop scheduling Phanden, Rakesh Kumar (rakesh_razz@yahoo.com), 1600, Springer London (80): : 9 - 12
- [6] Tardiness Minimisation for Job Shop Scheduling with Interval Uncertainty HYBRID ARTIFICIAL INTELLIGENT SYSTEMS, HAIS 2020, 2020, 12344 : 209 - 220
- [7] Minimizing tardiness for job shop scheduling under uncertainties 2016 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2016, : 582 - 587
- [8] Lot scheduling with multiple process routes in job shop Zhongguo Jixie Gongcheng, 2008, 2 (183-187):
- [9] Assessment of makespan performance for flexible process plans in job shop scheduling IFAC PAPERSONLINE, 2015, 48 (03): : 1948 - 1953
- [10] ACO integrated approach for solving flexible job-shop scheduling with multiple process plans 2018, CIMS (24): : 558 - 569