Numerical modeling of tunnels for the Copenhagen Metro

被引:0
|
作者
Hededal, O [1 ]
Eskesen, SD [1 ]
机构
[1] COWI Consulting Engineers & Planners AS, Lyngby, Denmark
关键词
tunnel; TBM; NATM; settlements; FLAC;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Copenhagen Metro comprises 8,5km of twin bored tunnels of which approximately 500m are NATM tunnels. The Metro is currently under construction under a Design and Build contract. This paper describes the numerical analyses performed as part of the Employer's evaluation of the Contractor's design. One of the most important aims of the design of the Metro has been to limit the ground movement in order to prevent damages to buildings and utilities. Several numerical analyses were used to assess the design with respect to construction sequence, variations in soil strength and stiffness, as well as geometric imperfections.
引用
收藏
页码:653 / 657
页数:5
相关论文
共 50 条
  • [41] Analytical and numerical modeling for the effects of thermal insulation in underground tunnels
    Liu W.V.
    Apel D.B.
    Bindiganavile V.S.
    Szymanski J.K.
    International Journal of Mining Science and Technology, 2016, 26 (02) : 267 - 276
  • [42] Some Tips on Numerical Modeling of Airflow and Fires in Road Tunnels
    Krol, Aleksander
    Krol, Malgorzata
    ENERGIES, 2021, 14 (09)
  • [43] Analytical and numerical modeling for the effects of thermal insulation in underground tunnels
    Liu, W. V.
    Apel, D. B.
    Bindiganavile, V. S.
    Szymanski, J. K.
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (02) : 267 - 276
  • [44] Numerical modeling of rockburst near fault zones in deep tunnels
    Manouchehrian, Amin
    Cai, Ming
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 80 : 164 - 180
  • [45] Numerical Modeling of the Seismically Induced Uplift Behavior of Twin Tunnels
    Zheng, Gang
    Yang, Pengbo
    Zhou, Haizuo
    Zhang, Wenbin
    Zhang, Tianqi
    Ma, Shaokun
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (01)
  • [46] DENMARK - COPENHAGEN METRO Delivered the first TBB EPB
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2013, (105): : 58 - 58
  • [47] Tunnelling in an urban environment: Experience from the Copenhagen Metro
    Eskesen, SD
    Erichsen, L
    Alvin, D
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 515 - 522
  • [48] Monitoring seepage of groundwater into the Stockholm Metro tunnels
    Celander, S.
    Strang, T.
    Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 552 - 558
  • [49] TUNNELS FOR THE NEW HONG KONG METRO.
    Haswell, Charles K.
    Tunnels and Tunnelling, 1977, 9 (06): : 31 - 35
  • [50] Tunnels - Barcelona metro extends its reach
    Brown, JL
    CIVIL ENGINEERING, 2003, 73 (10): : 16 - 17