Coupling methods for HTR-PM primary circuit

被引:7
|
作者
Lu Jianan [1 ]
Guo Jiong [1 ]
Kozlowski, Tomasz [2 ]
Li Fu [1 ]
机构
[1] Tsinghua Univ, Inst Nucl & New Energy Technol, Collaborat Innovat Ctr Adv Nucl Energy Technol, Key Lab Adv Reactor Engn & Safety,Minist Educ, Beijing 100084, Peoples R China
[2] Univ Illinois, Dept Nucl Plasma & Radiol Engn, Urbana, IL 61801 USA
基金
国家高技术研究发展计划(863计划);
关键词
JFNK; Picard; HTR-PM; Primary circuit; GAS-COOLED REACTOR;
D O I
10.1016/j.anucene.2018.01.048
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The purpose of this paper is to analyze coupling methods for High-Temperature Gas-Cooled Reactor Pebble bed Module (HTR-PM) primary circuit, including reactor core, steam generator, and other components. Each component has individual characteristics and is simulated by an independent code package. A feasible way to integrate these independent codes is by using Picard iteration. In practice, the primary circuit is divided into multiple parts based on physical fields or spatial domains. Another coupling method is Jacobian-free Newton-Krylov (JFNK), which is frequently applied for the simulation of coupled multi-physics systems due to its efficiency and capability for large-scale nonlinear problems. To demonstrate the efficiency of coupling method for tightly coupled primary circuit systems, several Picard and JFNK methods were compared consistently in this paper, where all the models, equations and codes for each method are the same. Especially for neutronics, we use the same additional equation for JFNK as the outer iteration step in power iteration. Results show that the equations in the reactor core and outside the reactor core should be solved simultaneously in Picard iteration, otherwise additional thermal hydraulics iterations are necessary. JFNK methods have shown better convergence behavior than Picard iteration, especially for computational efficiency. Since the nonlinear residual is evaluated directly from nonlinear equation set without iteration, linear preconditioned JFNK has shown efficient convergence, which is recommended by the authors as the first choice for HTR-PM primary circuit if the linear preconditioned JFNK is applicable and the well-performing preconditioner is available. However, for utilizing physical iteration processes, nonlinear preconditioned JFNK is a practical choice when integrating legacy codes. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:20 / 30
页数:11
相关论文
共 50 条
  • [11] Transient Study on the HTR-PM with TINTE-vPower Coupling Code Package
    Sun, Jun
    Sun, Ximing
    Zheng, Yanhua
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2020, 2020
  • [12] CFD investigation of bypass flow in HTR-PM
    Sun Ximing
    Chen Zhipeng
    Sun Jun
    Liu Yuan
    Zheng Yanhua
    Li Fu
    Shi Lei
    NUCLEAR ENGINEERING AND DESIGN, 2018, 329 : 147 - 155
  • [13] Minimum detectable activity concentration of online monitoring instrument in primary circuit of HTR-PM based on Monte Carlo simulation
    Nie, Rui
    Wang, Yu
    Zhou, Ziling
    Xie, Feng
    Zhao, Jun
    Cao, Jianzhu
    Ma, Qian
    Chen, Xi
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2025, 57 (01)
  • [14] HTR-PM helium circulator motor cooling
    Mo F.
    Zhang Y.
    Wang H.
    Zhang Q.
    Zhang, Youjie (zhangyj@tsinghua.edu.cn), 2018, Tsinghua University (58): : 188 - 191
  • [15] HTR-PM: Making dreams come true
    Zhang, Zuoyi
    Dong, Yujie
    Qi, Weiwei
    Sun, Jun
    NUCLEAR ENGINEERING INTERNATIONAL, 2019, 64 (775): : 16 - 18
  • [16] Air ingress analysis for two primary loop pipes rupture of HTR-PM
    Zheng, Yan-Hua
    Shi, Lei
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2010, 44 (SUPPL. 1): : 253 - 257
  • [17] ANALYSIS OF TRITIUM PRODUCTION AND DISTRIBUTION IN HTR-PM
    Wu, Yuanyu
    Cao, Jianzhu
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 3, 2011, : 703 - 707
  • [18] Coordinated Control System Design of HTR-PM Plant
    Dong, Zhe
    Pan, Yifei
    Huang, Xiaojin
    Dong, Yujie
    Zhang, Zuoyi
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 1309 - 1314
  • [19] Preparation of spherical fuel elements for HTR-PM in INET
    Zhou Xiangwen
    Lu Zhenming
    Jie, Zhang
    Bing, Liu
    Zou Yanwen
    Tang Chunhe
    Tang Yaping
    NUCLEAR ENGINEERING AND DESIGN, 2013, 263 : 456 - 461
  • [20] China First fuel shipped to HTR-PM project
    不详
    NUCLEAR ENGINEERING INTERNATIONAL, 2021, 66 (799): : 8 - 8