Single-machine scheduling with release dates, due dates and family setup times

被引:33
|
作者
Schutten, JMJ
vandeVelde, SL
Zijm, WHM
机构
[1] Faculty of Mechanical Engineering, University of Twente, 7500 AE Enschede
关键词
scheduling; maximum lateness; family setup times; branch-and-bound; setup jobs; preemption;
D O I
10.1287/mnsc.42.8.1165
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers' satisfaction by completing jobs before their due dates. We develop a branch-and-bound algorithm, and our computational results show that it solves almost all instances with up to about 40 jobs to optimality. The main algorithmic contribution is our lower bounding strategy to deal with family setup times. The key idea is to see a setup time as a setup job with a specific processing time, release date, due date, and precedence relations. We develop several sufficient conditions to derive setup jobs. We specify their parameters and precedence relations such that the optimal solution value of the modified problem obtained by ignoring the setup times, not the setup jobs, is no larger than the optimal solution value of the original problem. One lower bound for the modified problem proceeds by allowing preemption. Due to the agreeable precedence structure, the preemptive problem is solvable in O(n log n) time.
引用
收藏
页码:1165 / 1174
页数:10
相关论文
共 50 条
  • [41] Single machine scheduling with assignable due dates
    Qi, XT
    Yu, G
    Bard, JF
    DISCRETE APPLIED MATHEMATICS, 2002, 122 (1-3) : 211 - 233
  • [42] PREEMPTIVE SCHEDULING WITH RELEASE DATES, DELIVERY TIMES AND SEQUENCE INDEPENDENT SETUP TIMES
    ZDRZALKA, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 60 - 71
  • [43] An investigation on a two-agent single-machine scheduling problem with unequal release dates
    Yin, Yunqiang
    Wu, Wen-Hsiang
    Cheng, Shuenn-Ren
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 3062 - 3073
  • [44] SCHEDULING WITH RELEASE DATES ON A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME
    BELOUADAH, H
    POSNER, ME
    POTTS, CN
    DISCRETE APPLIED MATHEMATICS, 1992, 36 (03) : 213 - 231
  • [45] MINIMUM NUMBER OF TARDY JOBS IN SINGLE-MACHINE SCHEDULING WITH RELEASE DATES - AN IMPROVED ALGORITHM
    JOHN, TC
    WU, YB
    COMPUTERS & INDUSTRIAL ENGINEERING, 1987, 12 (03) : 223 - 230
  • [46] Minimizing the sum of makespan on multi-agent single-machine scheduling with release dates
    Wang, Xinyue
    Ren, Tao
    Bai, Danyu
    Ezeh, Chinenye
    Zhang, Haodong
    Dong, Zhuoran
    SWARM AND EVOLUTIONARY COMPUTATION, 2022, 69
  • [47] Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
    Byung-Cheon Choi
    Myoung-Ju Park
    Journal of Combinatorial Optimization, 2021, 41 : 781 - 793
  • [48] Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
    Choi, Byung-Cheon
    Park, Myoung-Ju
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2021, 41 (04) : 781 - 793
  • [49] The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan
    Nong, Q. Q.
    Ng, C. T.
    Cheng, T. C. E.
    OPERATIONS RESEARCH LETTERS, 2008, 36 (01) : 61 - 66
  • [50] Efficient heuristics and metaheuristics for the unrelated parallel machine scheduling problem with release dates and setup times
    Athmani, Mohamed Elamine
    Arbaoui, Taha
    Mimene, Younes
    Yalaoui, Farouk
    PROCEEDINGS OF THE 2022 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'22), 2022, : 177 - 185