Lead time anticipation in Supply Chain Operations Planning

被引:11
|
作者
Jansen, Michiel M. [1 ]
de Kok, Ton G. [1 ]
Fransoo, Jan C. [1 ]
机构
[1] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
关键词
Supply chain management; Hierarchical production planning; Lead time anticipation; Production smoothing; SIMULATION; MODELS;
D O I
10.1007/s00291-011-0267-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process in the PU and the lead time that is difficult to capture in the LP model formulation. We propose a two-step lead time anticipation (LTA) procedure where the LP model is first solved irrespective of the available production capacity and is subsequently updated with aggregate order release targets. The order release targets are generated by a local smoothing algorithm that accounts for the evolution of the stochastic workload in the PU. A solution that is both feasible with respect to the planned lead time and meets the material requirements may not exist. By means of discrete event simulation, we compare a conservative strategy where the production quantities are reduced to an optimistic strategy where the planned lead time constraint is allowed to be violated.
引用
收藏
页码:251 / 290
页数:40
相关论文
共 50 条
  • [31] Operations and supply chain management
    Barbosa-Povoa, Ana Paula
    IEMC - EUROPE 2008: INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE, EUROPE, CONFERENCE PROCEEDINGS: MANAGING ENGINEERING, TECHNOLOGY AND INNOVATION FOR GROWTH, 2008, : 387 - 388
  • [32] Logistics and supply chain operations
    Nahmias, S
    OPERATIONS RESEARCH, 1996, 44 (02) : 250 - 250
  • [33] Supply chain planning
    2000, Thomas Publ Co (15):
  • [34] A study of lead time variation impact on supply chain performance
    Jafar Heydari
    Reza Baradaran Kazemzadeh
    S. Kamal Chaharsooghi
    The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1206 - 1215
  • [35] ON STRATEGY OF THE DELIVERY LEAD TIME MANAGEMENT FOR A SUPPLER IN THE SUPPLY CHAIN
    Li Jing-yi
    Tan Hong-yang
    LISS 2011: PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE, VOL 2, 2011, : 279 - 283
  • [36] Impact of lead time variability in supply chain risk management
    Bandaly, Dia
    Satir, Ahmet
    Shanker, Latha
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 180 : 88 - 100
  • [37] The Impact of Lead-time on Bullwhip Effect in Supply Chain
    Wang, Xiaojing
    Liu, Zhixue
    Zheng, Changzheng
    Quan, Chunguang
    2008 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL 3, PROCEEDINGS, 2008, : 93 - 97
  • [38] The effect of lead-time on supply chain resilience performance
    Chang, Wei-Shiun
    Lin, Yu-Ting
    ASIA PACIFIC MANAGEMENT REVIEW, 2019, 24 (04) : 298 - 309
  • [39] Supply chain coordination with controllable lead time and asymmetric information
    Li, Yina
    Xu, Xuejun
    Zhao, Xiande
    Van Yeung, Jeff Hoi
    Ye, Fei
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 217 (01) : 108 - 119
  • [40] Research on lead time of supply chain and its interrelated cost
    Lin, Qiang
    Li, Qing
    Shi, Hui
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1569 - 1573