Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance

被引:10
|
作者
Krim, Hanane [1 ]
Benmansour, Rachid [1 ,2 ]
Duvivier, David [1 ]
Ait-Kadi, Daoud [3 ]
Hanafi, Said [1 ]
机构
[1] Polytech Univ Hauts De France, LAMIH, UMR CNRS 8201, F-59313 Valenciennes 9, France
[2] INSEA, SI2M Lab, Rabat, Morocco
[3] Univ Laval, Dept Mech Engn, Quebec City, PQ, Canada
关键词
Single machine scheduling; Preventive maintenance; Mathematical model; Heuristic; Lower bounds; 2 PARALLEL MACHINES; AVAILABILITY CONSTRAINT; FLOW-TIME; MINIMIZE; ALGORITHM;
D O I
10.1007/s10589-019-00142-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper tackles the single machine scheduling problem with periodic preventive maintenance in order to minimize the weighted sum of completion times. This criterion is certainly less studied than the makespan but it remains nonetheless interesting on the theoretical and practical levels. Indeed, the weights can quantify the holding cost per unit of time of the products to transform. Thus, this criterion can represent the global holding cost. This problem is proved to be NP-hard and a mixed integer linear programming formulation is proposed to solve small size instances of the problem. To solve large instances, we proposed three properties for this problem which generalize already existing works. These properties have been of great use in designing efficient heuristics capable of solving instances with up to 1000 jobs. To evaluate the performances of the proposed heuristics, lower bounds based on special cases of the problem are provided. Computational experiments show that the average percentage error of the best heuristic is less than 10%.
引用
收藏
页码:291 / 320
页数:30
相关论文
共 50 条
  • [31] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
    Chou, Fuh-Der
    Wang, Hui-Mei
    Chang, Tzu-Yun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (7-8): : 810 - 821
  • [32] Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
    Fuh-Der Chou
    Hui-Mei Wang
    Tzu-Yun Chang
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 810 - 821
  • [33] Meta-heuristics for the single-machine scheduling total weighted tardiness problem
    Madureira, Ana Maria
    Proceedings of the IEEE International Symposium on Assembly and Task Planning, 1999, : 405 - 410
  • [34] Truthfulness for the Sum of Weighted Completion Times
    Angel, Eric
    Bampis, Evripidis
    Pascual, Fanny
    Thibault, Nicolas
    COMPUTING AND COMBINATORICS, COCOON 2016, 2016, 9797 : 15 - 26
  • [35] Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times
    Ghaith Rabadi
    Reinaldo J. Moraga
    Ameer Al-Salem
    Journal of Intelligent Manufacturing, 2006, 17 : 85 - 97
  • [36] Heuristics for the unrelated parallel machine scheduling problem with setup times
    Rabadi, G
    Moraga, RJ
    Al-Salem, A
    JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (01) : 85 - 97
  • [37] A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times
    Sung, C. S.
    Kim, Hyun Ah
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (02) : 1038 - 1048
  • [38] Single machine scheduling problem of minimising weighted sum of maximum weighted earliness and weighted number of tardy jobs
    Eghbalpor, Parvaneh
    Reisi-Nafchi, Mohammad
    Moslehi, Ghasem
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2021, 16 (02) : 154 - 186
  • [39] Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective
    Sotskov, Yuri N.
    Egorova, Natalja G.
    ALGORITHMS, 2018, 11 (05)
  • [40] A Meta-heuristic Approach to the Single Machine Scheduling Problem with Periodic Maintenance
    Buyukozkan, Kadir
    Baysal, Mehmet Emin
    Yalcin, Cahit
    Sarucan, Ahmet
    INTELLIGENT AND FUZZY SYSTEMS: DIGITAL ACCELERATION AND THE NEW NORMAL, INFUS 2022, VOL 1, 2022, 504 : 864 - 869