Software process improvement activities based on CMM and their application

被引:0
|
作者
Fujiwara, T [1 ]
Yamada, S [1 ]
机构
[1] Fujitsu Peripherals Ltd, Dev Div, Dev Dept 3, Hyogo 6731447, Japan
关键词
capability matulity model; software process improvement; software quality; peer reviews;
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
In our company, we tended to the conventional software process in which the developer's activities depend on their tacit knowledge. Therefore, similar mistakes and problems were often observed in two or more projects. By these mistakes and problems, the delivery delay of the software product and the quality problem after delivery lead to pressure of profits and loss of trust. In the worst case, the crisis of corporate fate is also expected. So, our company has performed the self-assessment of the degree of software process maturity by using the CMM at the shift from the 2nd edition of ISO9001 to the 3rd edition, and we have been defining the standard process to the best now. Moreover, based on the assessment results, we have been selecting the CAM's KPAs which can obtain the great improvement effect from the non-attained items, and tackling positively aiming at improvement in the process capability. In this paper, we focus on some KPAs from the non-attained items, show the improvement results obtained in two projects, and investigate them.
引用
收藏
页码:235 / 240
页数:6
相关论文
共 50 条
  • [1] Software Process Improvement Based On CMM
    Huang, Jingang
    Zhou, Junjie
    Yan, Yaowei
    [J]. PROCEEDINGS OF THE 2013 ASIA-PACIFIC COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY CONFERENCE, 2013, : 594 - 600
  • [2] Research on Software Process Improvement Model Based on CMM
    Li, Jianguo
    Li, Jinghui
    Li, Hongbo
    [J]. PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 29, 2008, 29 : 368 - 371
  • [3] Integrating dynamic models for CMM-based software process improvement
    Ruiz, M
    Ramos, I
    Toro, M
    [J]. PRODUCT FOCUSED SOFTWARE PROCESS IMPROVEMENT, PROCEEDINGS, 2002, 2559 : 63 - 77
  • [4] CMM-based software process improvement training: The first two years
    Beckman, K
    Phelan, J
    Rugg, D
    [J]. NINTH CONFERENCE ON SOFTWARE ENGINEERING EDUCATION, PROCEEDINGS, 1996, : 42 - 51
  • [5] Research on software process improvement model of CMM based on key factor division
    Wang, Ning
    Qiu, Xu-Dong
    [J]. Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (03): : 432 - 437
  • [6] Defining a set of criteria for the assessment of tool support for CMM-based software process improvement
    Ellmer, E
    Merkl, D
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL SYMPOSIUM ON ASSESSMENT OF SOFTWARE TOOLS, 1996, : 77 - 86
  • [7] Considering People CMM for Managing Factors that Affect Software Process Improvement
    Matturro, G.
    Saavedra, J.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2012, 10 (02) : 1603 - 1615
  • [8] A metamodel for the CMM software process
    Li, J
    Li, MS
    Wu, ZC
    Wang, Q
    [J]. PARALLEL AND DISTRIBUTED PROCESSING AND APPLICATIONS, PROCEEDINGS, 2004, 3358 : 446 - 450
  • [9] Simulation in support of CMM-based process improvement
    Christie, AM
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 1999, 46 (2-3) : 107 - 112
  • [10] Simulation in support of CMM-based process improvement
    Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA 15213-3890, United States
    [J]. J Syst Software, 2 (107-112):