共 50 条
- [2] Productivity Improvement of a Production Line Through Quick Changeover Concept - A Case Study [J]. TRANSDISCIPLINARY ENGINEERING METHODS FOR SOCIAL INNOVATION OF INDUSTRY 4.0, 2018, 7 : 897 - 906
- [3] CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL "SMED" - A CASE STUDY FROM FOOD SECTOR [J]. 14TH ANNUAL INTERNATIONAL BATA CONFERENCE FOR PH.D. STUDENTS AND YOUNG RESEARCHERS (DOKBAT), 2018, : 103 - 115
- [4] Injection molding control parameter assessment by nested Taguchi design of simulation experiments: a case study [J]. MATERIAL FORMING, ESAFORM 2024, 2024, 41 : 2757 - 2766
- [5] Performance Measurement of SMED Improved Plastic Injection Molding Production by Using Process Capability Analysis for Attribute Data [J]. ADVANCES IN MANUFACTURING II, VOL 2 - PRODUCTION ENGINEERING AND MANAGEMENT, 2019, : 188 - 205
- [6] Optimization of Rheology Parameters for Feedstock by Powder Injection Molding (PIM) Via Taguchi Analysis [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2023, 15 (07):
- [7] Optimisation of injection molding process parameters for improvement in tensile strength using the taguchi experimental design [J]. International Journal of COMADEM, 2023, 26 (01): : 13 - 22
- [9] Green density optimization of stainless steel powder via metal injection molding by Taguchi method [J]. 8TH INTERNATIONAL CONFERENCE ON MECHANICAL AND MANUFACTURING ENGINEERING 2017 (ICME'17), 2017, 135
- [10] The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study [J]. 1ST INTERNATIONAL POSTGRADUATE CONFERENCE ON MECHANICAL ENGINEERING (IPCME2018), 2019, 469