Comprehensive Fuzzy Evaluation for Transmission Network Planning Scheme Based on Gray Correlation Analysis

被引:1
|
作者
Liu Lian-Guang [1 ]
Zhao Wan-Li [1 ]
Chen Yan-Wei [1 ]
机构
[1] North China Elect Power Univ, Beijing 102206, Peoples R China
关键词
power system; transmission network planning; gray correlation analysis; comprehensive fuzzy evaluation;
D O I
10.4028/www.scientific.net/AMR.732-733.1292
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The comprehensive fuzzy evaluation method for transmission network planning scheme has the drawback that relying more on the subjectivity. To solve this problem, gray theory is introduced into comprehensive fuzzy evaluation method. Gray correlation analysis method is used to calculate gray correlation coefficient as the membership of evaluation index to get fuzzy evaluation matrix. Then, the fuzzy weight vector is determined by the subjective and objective empowerment by integrating AHP and entropy method. Comprehensive fuzzy evaluation vector is obtained by using composite operator to synthesis evaluation matrix and fuzzy weight vector. The obtained result is used to evaluate transmission network planning scheme. Therefore, the problem that judger definate membership function based on subjective view is solved by combining the two methods. Calculation results show that the proposed method has a certain practical value.
引用
收藏
页码:1292 / 1296
页数:5
相关论文
共 50 条
  • [1] Comprehensive Fuzzy Evaluation for Power Transmission Network Planning Based on Entropy Weight Method
    Dang Ke
    Lv Pan
    Zhang Hui-ming
    [J]. ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL II, PROCEEDINGS, 2009, : 676 - 680
  • [2] A New MCDM Method in Transmission Network Planning Based on Gray Correlation Degree and TOPSIS
    Fan Liguo
    Li Yanhong
    [J]. PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 3, 2008, : 462 - 467
  • [3] Comprehensive evaluation of transmission network planning scheme based on improved analytic hierarchy process, CRITIC method and TOPSIS
    Zhao, Shuqiang
    Tang, Shanfa
    [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2019, 39 (03): : 143 - 148
  • [4] The Comprehensive Evaluation of Regional Agricultural Brand Competitiveness Based on Fuzzy Gray Analysis
    Tong, Guangji
    Wang, Wei
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 3687 - 3691
  • [5] Comprehensive evaluation index system of generation planning based on gray correlation degree and evidence theory
    Zhong, Jiaqing
    Wang, Lu
    Zhao, Nan
    [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2020, 41 (08): : 95 - 101
  • [6] Research on the Evaluation of Road Network Planning Based on Entropy-Fuzzy Comprehensive Evaluation Method
    Wang, H.
    Yuan, Z. Z.
    [J]. 4TH INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES (ICMEAT 2015), 2015, : 499 - 502
  • [7] Safety Assessment of Transmission Grid Based on Fuzzy Comprehensive Evaluation and BP Neural Network
    Huang, Yuansheng
    Fang, Wei
    Tian, Chengfang
    [J]. ADVANCED MEASUREMENT AND TEST, PARTS 1 AND 2, 2010, 439-440 : 528 - 533
  • [8] Evaluation of Distribution Network Projects Based on the Improved Gray Correlation Analysis Method
    Chen, Mei
    Liu, Xiaofeng
    Chen, Ning
    Gao, Bingtuan
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2016, : 82 - 85
  • [9] Comprehensive evaluation model based on gray correlative analysis and its application to selecting blasting scheme
    Shan Ren-liang
    Huang Bao-long
    Li Guang-jing
    [J]. ROCK AND SOIL MECHANICS, 2009, 30 : 206 - 210
  • [10] Distribution Network Planning Based on Entropy Fuzzy Comprehensive Method
    Jia, Zhengyuan
    Fan, Zhou
    Jiang, Miaomiao
    [J]. ADVANCED MECHANICAL ENGINEERING, PTS 1 AND 2, 2010, 26-28 : 780 - 784