Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels

被引:177
|
作者
Hyun, Ki-Chang [1 ]
Min, Sangyoon [2 ]
Choi, Hangseok [3 ]
Park, Jeongjun [3 ]
Lee, In-Mo [3 ]
机构
[1] Hyundai E&C, Res & Dev Div, Seoul, South Korea
[2] Parsons Corp, Boston, MA USA
[3] Korea Univ, Sch Civil Environm & Architectural Engn, Seoul, South Korea
关键词
Shield TBM; Risk analysis; Fault-tree analysis (FTA); Analytic hierarchy process (AHP);
D O I
10.1016/j.tust.2015.04.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the potential risk of undesirable events occurring during tunneling with application of a shield tunnel boring machine (TBM) method is discussed along with the risk analysis which can systematically assess overall risk levels. Potential risks and typical scenarios pertaining to shield TBM tunnels have been investigated based on previous case histories and correspondence with experts. The relevant risks from undesirable events were categorized into four groups: cutter-related malfunction, machine blockage or hold-up, mucking problems that hinder transporting excavated materials, and segment defects. A fault-tree set was constructed by grouping risk factors (or causes) into geological, design and construction/management factors. Risk analysis was performed by adopting fault-tree analysis (FTA) and an analytic hierarchy process (AHP) with consideration of the probability and impact of the risks. In addition, the proposed method was reliably validated by comparison with field observation, and thus indicates its applicability to risk management for shield TBM tunneling. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:121 / 129
页数:9
相关论文
共 50 条
  • [1] Fault diagnosis of power transformer based on fault-tree analysis (FTA)
    Wang, Yongliang
    Li, Xiaoqiang
    Ma, Jianwei
    Li, SuoYu
    2017 INTERNATIONAL SYMPOSIUM ON RESOURCE EXPLORATION AND ENVIRONMENTAL SCIENCE (REES 2017), 2017, 64
  • [2] Prioritizing HAZOP analysis using analytic hierarchy process (AHP)
    Mohamad Rizza Othman
    Rosshila Idris
    Mimi Haryani Hassim
    Wan Hanisah Wan Ibrahim
    Clean Technologies and Environmental Policy, 2016, 18 : 1345 - 1360
  • [3] Prioritizing HAZOP analysis using analytic hierarchy process (AHP)
    Othman, Mohamad Rizza
    Idris, Rosshila
    Hassim, Mimi Haryani
    Ibrahim, Wan Hanisah Wan
    Clean Technologies and Environmental Policy, 2016, 18 (05) : 1345 - 1360
  • [4] Risk Analysis of Underground Tunnel Construction with Tunnel Boring Machine by Using Fault Tree Analysis and Fuzzy Analytic Hierarchy Process
    Koohathongsumrit, Nitidetch
    Chankham, Wasana
    SAFETY, 2024, 10 (03)
  • [5] FAULT-TREE ANALYSIS USING A BINARY DECISION TREE
    SCHNEEWEISS, WG
    IEEE TRANSACTIONS ON RELIABILITY, 1985, 34 (05) : 453 - 457
  • [6] PIPELINE RISK ASSESSMENT USING ANALYTIC HIERARCHY PROCESS (AHP)
    Yasseri, Sirous F.
    Mahani, R. B.
    OMAE2011: PROCEEDINGS OF THE ASME 30TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, VOL 4: PIPELINE AND RISER TECHNOLOGY, 2011, : 1 - +
  • [7] FUZZY FAULT-TREE ANALYSIS USING FAILURE POSSIBILITY
    LIANG, GS
    WANG, MJJ
    MICROELECTRONICS AND RELIABILITY, 1993, 33 (04): : 583 - 597
  • [8] Impact analysis of logistics facility relocation using the analytic hierarchy process (AHP)
    Opasanon, Sathaporn
    Lertsanti, Pattarakamol
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2013, 20 (03) : 325 - 339
  • [9] Risk analysis of domino effect of leakage accident of petrochemical pipeline based on analytic hierarchy process and fuzzy fault tree analysis
    Diao, Xu
    Jiang, Juncheng
    Mebarki, Ahmed
    Ni, Lei
    Duo, Yingquan
    Chen, Sining
    Wang, Yuanyuan
    Zhang, Shengzhu
    SAFETY SCIENCE, 2025, 187
  • [10] Treatment of general dependencies in system fault-tree and risk analysis
    Vaurio, JK
    IEEE TRANSACTIONS ON RELIABILITY, 2002, 51 (03) : 278 - 287