Time is Money: Relative Value Units and Operative Time in Otolaryngology

被引:2
|
作者
Barinsky, Gregory L. [1 ]
Wassef, David W. [1 ]
Povolotskiy, Roman [1 ]
Grube, Jordon G. [1 ]
Hsueh, Wayne D. [1 ,2 ]
Baredes, Soly [1 ,2 ]
Eloy, Jean Anderson [1 ,2 ,3 ,4 ,5 ]
机构
[1] Rutgers New Jersey Med Sch, Dept Otolaryngol Head & Neck Surg, Newark, NJ 07103 USA
[2] Rutgers New Jersey Med Sch, Ctr Skull Base & Pituitary Surg, Neurol Inst New Jersey, Newark, NJ 07103 USA
[3] Rutgers New Jersey Med Sch, Dept Neurol Surg, Newark, NJ 07103 USA
[4] Rutgers New Jersey Med Sch, Dept Ophthalmol & Visual Sci, Newark, NJ 07103 USA
[5] St Barnabas Med Ctr RWJBarnabas Hlth, Dept Otolaryngol & Facial Plast Surg, Livingston, NJ USA
来源
LARYNGOSCOPE | 2021年 / 131卷 / 02期
关键词
Relative value unit; reimbursement; operative time; billing; otolaryngology; wRVU; procedure complexity; physician compensation; otolaryngology compensation; NSQIP; PHYSICIAN; COMPLEXITY;
D O I
10.1002/lary.28988
中图分类号
R-3 [医学研究方法]; R3 [基础医学];
学科分类号
1001 ;
摘要
Objectives Physician compensation for procedures is typically rooted in the work relative value unit (wRVU) system. Operative time is one of the factors that goes into the determination of wRVU assignment. There should be consistency between the wRVU/hr rate, irrespective of average operative time required to perform certain procedures. We investigate if wRVU assignment for otolaryngology procedures adequately accounts for increased operative time. Study Design Retrospective analysis of a surgical database. Methods NSQIP was queried from 2015-2018 for the top 50 most frequently performed otolaryngology Current Procedural Terminology (CPT) codes completed as standalone procedures. Median operative time was determined for each CPT code, and wRVU/hr was calculated. Correlations between operative time, wRVU, and wRVU/hr were investigated using linear regression analysis. A secondary analysis using complication rate as an indicator for procedure complexity was performed to examine the relation between wRVUs and complication rates. Results Fifty CPT codes containing 64,084 patients where only one code was reported were included in this analysis. The median operative time was 84 minutes, median wRVU was 11.23, and median wRVU/hour was 7.96. Linear regression analysis demonstrated a strong positive correlation between operative time and wRVU assignment (R-2= 0.805,P< .001). Further analysis found no correlation between operative time and wRVU/hr (R-2= 0.008,P= .525). Linear regression of wRVU/hr and complication rate showed a statistically significant positive correlation (R-2= 0.113,P= .017). Conclusion This analysis suggests that compensation for otolaryngology procedures is positively correlated with operative time. Surgeries where more than one code is reported could not be evaluated, thus excluding some common combination of procedures performed by otolaryngologists. Level of Evidence 4Laryngoscope, 2020
引用
收藏
页码:E395 / E400
页数:6
相关论文
共 50 条
  • [31] Are Work Relative Value Units Correlated With Operative Duration of Common Surgical Procedures?
    Haeuser, Lorine
    Cone, Eugene B.
    Cole, Alexander P.
    Marchese, Maya
    Trinh, Quoc-Dien
    [J]. AMERICAN JOURNAL OF MANAGED CARE, 2022, 28 (04): : 148 - 151
  • [32] VALUE OF TIME AND DEMAND FOR MONEY - EVIDENCE FROM UK TIME SERIES DATA
    KARNI, E
    [J]. AUSTRALIAN ECONOMIC PAPERS, 1975, 14 (25) : 231 - 239
  • [33] Single Machine Scheduling Considering Time Value of Money
    Zhi, Rongteng
    Xu, Yinfeng
    Zheng, Feifeng
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 887 - 892
  • [34] Management: The time value of money in textiles and apparel - 2
    Hergeth, Helmut
    [J]. Textiles Magazine, 26 (01):
  • [35] THE TIME VALUE OF MONEY - CLAYTON,GE, SPIVEY,CB
    ANDERSON, HR
    [J]. ACCOUNTING REVIEW, 1982, 57 (01): : 217 - 217
  • [36] System reliability optimization using time value of money
    Hamadani, Ali Zeinal
    Khorshidi, Hadi Akbarzade
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4): : 97 - 106
  • [37] EFFECTS OF INFLATION AND TIME VALUE OF MONEY ON DRILLING OPTIMIZATION
    AJIENKA, JA
    OWOLABI, OO
    [J]. ENERGY SOURCES, 1993, 15 (03): : 451 - 456
  • [38] Stochastic Inventory Model Considering the Time Value of Money
    Ming, Jiexiu
    [J]. 2015 5th International Conference on Applied Social Science (ICASS 2015), Pt 4, 2015, 83 : 89 - 91
  • [39] RANDOM VARIABLES, TIME VALUE OF MONEY AND CAPITAL EXPENDITURES
    KABAK, IW
    OWEN, J
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 17 (03): : 142 - &
  • [40] THE VALUE OF TIME AND RECENT US MONEY DEMAND INSTABILITY
    ARIZE, AC
    DARRAT, AF
    [J]. SOUTHERN ECONOMIC JOURNAL, 1994, 60 (03) : 564 - 578