- [41] 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel Geomechanik und Tunnelbau, 2019, 12 (05): : 595 - 603
- [42] Gotthard base tunnel - A project of a quarter century eb - Elektrische Bahnen, 2015, 113 (6-7): : 298 - 305
- [43] TBMs for the Brenner Base Tunnel – design, developments and experience from the manufacturer's perspective Geomechanik und Tunnelbau, 2024, 17 (06): : 613 - 621
- [44] Brenner Base Tunnel – Tunnelling in the immediate vicinity of existing structures on the Tulfes–Pfons contract Geomechanik und Tunnelbau, 2019, 12 (06): : 708 - 715
- [46] Hydrogeology of the Brenner Base Tunnel in the Italian section: Observed inflows and forward monitoring procedures PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 351 - 359
- [47] Concept, design and testing of an innovative geothermal heat exchanger installed at the Brenner Base Tunnel GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (141): : 27 - 41
- [48] Brenner Base Tunnel & Isarco River Underpass Section: several technical and operational solutions GALLERIE E GRANDI OPERE SOTTERRANEE, 2018, (125): : 33 - 44
- [49] Brenner base tunnel, construction lot H41 Sill Gorge–Pfons: challenges based on previous construction lots in the project area Geomechanik und Tunnelbau, 2023, 16 (04): : 353 - 369