Economic Evaluation of Regulatory Tariff Risk Planning for an Electric Power Company

被引:7
|
作者
Arango, L. G. [1 ]
Arango, H. [1 ]
Deccache, E. [1 ]
Bonatto, B. D. [1 ]
Pamplona, E. O. [1 ]
机构
[1] Unifei Fed Univ Itajuba, Ave BPS,1303, BR-37500903 Itajuba, MG, Brazil
关键词
Commercial energy losses; Regulated electric power company; Consumers; Tariff revision; Regulation; Risk; Regulatory tariffs; TAROT;
D O I
10.1007/s40313-018-00437-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Regulatory energy tariff revision planning conducted by the Brazilian regulatory agency ANEEL is based on the electric power company's accrued costs during the previous tariff revision cycle and the gain in productivity seen during this same period. However, this planning considers purely deterministic variables, which in practice are known for presenting a certain degree of uncertainty. This article uses the TAROT (optimized tariff economic model) socioeconomic model to simulate the tariff revision process of a regulated electric power company and considers a selection of important stochastic variables for the revision process, such as consumer energy consumption, the purchased energy cost from the generator and commercial energy losses. Therefore, a risk study will be conducted to present a methodology for calculating and determining the regulatory tariff of companies under risk conditions, which is designed to assist ANEEL in regulating the electric power sector.
引用
收藏
页码:292 / 300
页数:9
相关论文
共 50 条
  • [31] On-demand valet charging for electric vehicles: Economic equilibrium, infrastructure planning and regulatory incentives
    Lai, Zhijie
    Li, Sen
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2022, 140
  • [32] Risk assessment of natural disaster in urban electric power network planning
    He, Yongxiu
    Zhu, Jiang
    Luo, Tao
    He, Haiying
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2011, 26 (12): : 205 - 210
  • [33] Specific features of the tariff system of the Denmark electric power engineering
    Kozlov, V.B.
    Khersel', J.
    Teploenergetika, 1997, (05): : 73 - 74
  • [34] Economic benefit and risk evaluation of power transformer overloading
    Chénier, R
    Aubin, J
    2001 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, CONFERENCE PROCEEDINGS, VOLS 1-3, 2001, : 459 - 462
  • [35] THE TOKYO ELECTRIC-POWER COMPANY (TEPCO) FUEL-CELL EVALUATION PROGRAM
    SHIBATA, K
    JOURNAL OF POWER SOURCES, 1992, 37 (1-2) : 81 - 99
  • [36] Project Management Maturity in an electric power company
    da Silva Nunes, Diego Augusto
    Porto Bellini, Carlo Gabriel
    CONTABILIDADE GESTAO E GOVERNANCA, 2011, 14 (01): : 94 - 106
  • [37] Absences and employee attitudes in an electric power company
    Hanes, Bernard
    PERSONNEL PSYCHOLOGY, 1954, 7 (03) : 440 - 441
  • [38] Absences and employee attitudes in an electric power company
    Jurgensen, C. E.
    JOURNAL OF APPLIED PSYCHOLOGY, 1955, 39 (03) : 201 - 202
  • [39] Expectation for power conversion technologies from the electric power company
    Hasegawa, T
    PCC-OSAKA 2002: PROCEEDINGS OF THE POWER CONVERSION CONFERENCE-OSAKA 2002, VOLS I - III, 2002, : 341 - 346
  • [40] Optimal power purchase planning of Hainan power grid company
    Zhang, Yongjun
    Yuan, Wengen
    Li, Bangfeng
    Liao, Minchuan
    2007 CONFERENCE PROCEEDINGS IPEC, VOLS 1-3, 2007, : 1355 - +