A GLOBAL AND LOCAL SEARCH APPROACH TO QUAY CRANE SCHEDULING PROBLEM

被引:0
|
作者
Perelygin, Kyrylo [1 ]
Kim, Joseph J. [1 ]
机构
[1] Calif State Univ Long Beach, Dept Civil Engn & Construct Management, 1250 Bellflower Blvd, Long Beach, CA 90840 USA
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The container flow in terminals at a port is often bottlenecked due to the slow operations of the quay cranes in a scarce terminal land space. The quay crane scheduling problem (QCSP) is a major problem because of the assignment of expensive quay cranes to multiple vessel-holds for container discharging and loading operation. This paper presents a hybrid QCSP Solver, which combines genetic algorithms for global search with steepest ascent hill climbing for local search. Numerical experiments are performed with small- and large-sized random QCSP instances. The experimental results revealed that the hybrid QCSP Solver provides a better solution than the stand-alone QCSP Solver. By scheduling the dynamic operation of quay cranes it is expected that the developed decision making tool will provide terminal planners with a guideline to enhancing the assignment of quay cranes to a vessel.
引用
收藏
页码:1563 / 1570
页数:8
相关论文
共 50 条
  • [21] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [22] Research on Quay Crane Scheduling Problem By Hybrid Genetic Algorithm
    Liang, Cheng ji
    Huang, You fang
    Yang, Yang
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2131 - +
  • [23] A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
    Pasquale Legato
    Roberto Trunfio
    [J]. 4OR, 2014, 12 : 123 - 156
  • [24] A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
    Legato, Pasquale
    Trunfio, Roberto
    [J]. 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2014, 12 (02): : 123 - 156
  • [25] Solving for a Quay Crane Scheduling and Assignment Problem by Simulated Annealing
    Tavakkoli-Moghaddam, Reza
    Taheri, Farid
    Bazzazi, Mohammad
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 326 - 333
  • [26] A Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Perez-Rodriguez, Ricardo
    [J]. MATHEMATICAL AND COMPUTATIONAL APPLICATIONS, 2021, 26 (03)
  • [27] A workload balancing genetic algorithm for the quay crane scheduling problem
    Chung, S. H.
    Chan, Felix T. S.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 4820 - 4834
  • [28] Modeling and solution of the joint quay crane and truck scheduling problem
    Tang, Lixin
    Zhao, Jiao
    Liu, Jiyin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (03) : 978 - 990
  • [29] A genetic algorithm for solving the quay crane scheduling and allocation problem
    Olteanu, S.
    Costescu, D.
    Rusca, A.
    Oprea, C.
    [J]. MODTECH INTERNATIONAL CONFERENCE - MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING VI (MODTECH 2018), 2018, 400
  • [30] Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Exposito-Izquierdo, Christopher
    Luis Gonzalez-Velarde, Jose
    Melian-Batista, Belen
    Marcos Moreno-Vega, J.
    [J]. APPLIED SOFT COMPUTING, 2013, 13 (10) : 4063 - 4076