Probabilistic available transfer capability assessment in power systems with wind power integration

被引:9
|
作者
Sun, Xin [1 ]
Tian, Zhongbei [2 ]
Rao, Yufei [1 ]
Li, Zhaohui [1 ]
Tricoli, Pietro [2 ]
机构
[1] State Grid Henan Co, Elect Power Res Inst, Zhengzhou, Henan, Peoples R China
[2] Univ Birmingham, Dept Elect Elect & Syst Engn, Birmingham, W Midlands, England
关键词
power transmission reliability; load flow; power system security; power system reliability; power transmission planning; wind power plants; stochastic processes; Monte Carlo methods; probability; current deterministic tools; incorporate significant stochastic wind power; present-day power system decision-making; probabilistic assessment method; repeated ATC evaluations; exhaustive set; converged results; Monte Carlo simulation; computation burden; statistically-equivalent surrogate model; ATC solution; low-rank approximation; LRA; wind power generation; probabilistic ATC; suitable ATC level; modified IEEE 118-bus system; probabilistic available transfer capability assessment; power systems; wind power integration; LOW-RANK APPROXIMATION; GENERATION; MODELS; FLOW;
D O I
10.1049/iet-rpg.2019.1383
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Extending current deterministic tools to incorporate significant stochastic wind power is becoming an important as well as challenging task for present-day power system decision-making. This study proposes a novel probabilistic assessment method to assess the available transfer capability (ATC). Usually, repeated ATC evaluations with an exhaustive set of samples are needed to obtain converged results by the Monte Carlo simulation. To alleviate the computation burden, a statistically-equivalent surrogate model for the ATC solution is constructed based on the canonical low-rank approximation (LRA). By implementing LRA for the base case and a set of enumerated contingencies, the uncertainties of wind power generation and load, as well as transmission equipment outages, are addressed efficiently. With the proposed method, the probabilistic ATC is characterised, and the most influential uncertain factors are identified, which helps to determine a suitable ATC level. The effectiveness of the proposed method is validated via case studies with a modified IEEE 118-bus system.
引用
收藏
页码:1912 / 1920
页数:9
相关论文
共 50 条
  • [1] Probabilistic Assessment of Available Transfer Capability Incorporating Load and Wind Power Uncertainties
    Reyad, Hala W.
    Elfar, Medhat
    El-Araby, E. E.
    [J]. IEEE ACCESS, 2023, 11 : 39048 - 39065
  • [2] Probabilistic Available Transfer Capability Evaluation for Power Systems Including High Penetration of Wind Power
    Fang, Xin
    Li, Fangxing
    Gao, Ningchao
    [J]. 2014 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2014,
  • [3] Calculation of Probabilistic Available Transfer Capability in Wind Power Integrated System
    Li, Guoqing
    Zhang, Fangjing
    Chen, Houhe
    [J]. RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY, PTS 1-6, 2014, 448-453 : 2524 - 2529
  • [4] Probabilistic assessment of available transfer capability considering spatial correlation in wind power integrated system
    Luo Gang
    Chen Jinfu
    Cai Defu
    Shi Dongyuan
    Xianzhong, Duan
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (12) : 1527 - 1535
  • [5] Fast calculation of probabilistic available transfer capability considering correlation in wind power integrated systems
    Luo, Gang
    Shi, Dongyuan
    Cai, Defu
    Chen, Jinfu
    Duan, Xianzhong
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 34 (07): : 1024 - 1032
  • [6] Probabilistic Available Transfer Capability Calculation of Wind Farm Incorporated Power System
    Li Zhongcheng
    Zhang Buhan
    Ge Yebin
    Chen Yi
    Miao Xiaogang
    Zhang Lidong
    Wu Junli
    Bie Pei
    [J]. APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2, 2013, 724-725 : 582 - 586
  • [7] Assessment of available transfer capability for practical power systems with margins
    Gnanadass, R
    Manivannan, K
    Palanivelu, TG
    [J]. IEEE TENCON 2003: CONFERENCE ON CONVERGENT TECHNOLOGIES FOR THE ASIA-PACIFIC REGION, VOLS 1-4, 2003, : 445 - 449
  • [8] A Chance-constrained Approach for Available Transfer Capability Evaluation for Power Systems With Wind Farm Integration
    Chen, Jinfu
    Sun, Xin
    Duan, Xianzhong
    Yang, Zengli
    Zhou, Hubing
    Wang, Jiabin
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (23): : 6804 - 6814
  • [9] Available transfer capability assessment of the Malaysian power system
    Othman, MM
    Mohamed, A
    Hussein, A
    [J]. 2002 STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT, PROCEEDINGS: GLOBALIZING RESEARCH AND DEVELOPMENT IN ELECTRICAL AND ELECTRONICS ENGINEERING, 2002, : 184 - 187
  • [10] Optimal Available Transfer Capability Assessment Strategy for Wind Integrated Transmission Systems Considering Uncertainty of Wind Power Probability Distribution
    Xie, Jun
    Wang, Lu
    Bian, Qiaoyan
    Zhang, Xiaohua
    Zeng, Dan
    Wang, Ke
    [J]. ENERGIES, 2016, 9 (09)