Scheduling tests in automotive R&D projects

被引:29
|
作者
Bartels, J. -H. [1 ]
Zimmermann, J. [1 ]
机构
[1] Tech Univ Clausthal, Inst Management & Econ, D-38678 Clausthal Zellerfeld, Germany
关键词
Project scheduling; Renewable and cumulative resources; Multiple execution modes; Experimental vehicles;
D O I
10.1016/j.ejor.2007.11.010
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In automotive R&D projects a major part of development cost is caused by tests which utilize expensive experimental vehicles. In this paper, we introduce an approach for scheduling the individual tests such that the number of required experimental vehicles is minimized. The proposed approach is based on a new type of multi-mode resource-constrained project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources. We propose a MILP formulation, which is solvable for small problem instances, as well as several variants of a priority-rule based method that serve to solve large problem instances. The developed solution methods are examined in a comprehensive computational study. For a real-world problem instance it is shown that the introduced approach may enhance the current methods applied in practice. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:805 / 819
页数:15