Scheduling tests in automotive R&D projects

被引:29
|
作者
Bartels, J. -H. [1 ]
Zimmermann, J. [1 ]
机构
[1] Tech Univ Clausthal, Inst Management & Econ, D-38678 Clausthal Zellerfeld, Germany
关键词
Project scheduling; Renewable and cumulative resources; Multiple execution modes; Experimental vehicles;
D O I
10.1016/j.ejor.2007.11.010
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In automotive R&D projects a major part of development cost is caused by tests which utilize expensive experimental vehicles. In this paper, we introduce an approach for scheduling the individual tests such that the number of required experimental vehicles is minimized. The proposed approach is based on a new type of multi-mode resource-constrained project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources. We propose a MILP formulation, which is solvable for small problem instances, as well as several variants of a priority-rule based method that serve to solve large problem instances. The developed solution methods are examined in a comprehensive computational study. For a real-world problem instance it is shown that the introduced approach may enhance the current methods applied in practice. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:805 / 819
页数:15
相关论文
共 50 条
  • [1] An exact method for scheduling of the alternative technologies in R&D projects
    Ranjbar, Mohammad
    Davari, Morteza
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 395 - 405
  • [2] Evaluating knowledge benefits of automotive lightweighting materials R&D projects
    Peretz, Jean H.
    Das, Sujit
    Tonn, Bruce E.
    EVALUATION AND PROGRAM PLANNING, 2009, 32 (03) : 300 - 309
  • [3] R&D projects database
    Gupta, K. R.
    CURRENT SCIENCE, 2010, 98 (07): : 882 - 883
  • [4] Evaluation of R&D projects
    不详
    RESEARCH-TECHNOLOGY MANAGEMENT, 1996, 39 (02) : 62 - 62
  • [5] On the Failure of R&D Projects
    Link, Albert N.
    Wright, Mike
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2015, 62 (04) : 442 - 448
  • [6] R&D projects announced
    不详
    CHEMICAL & ENGINEERING NEWS, 2001, 79 (52) : 22 - 22
  • [7] Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm
    Liu, Mengqi
    Shan, Miyuan
    Wu, Juan
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [8] The Impact of Big Data and Knowledge Management on R&D Projects from Automotive Industry
    Palade, Horatiu Constantin
    Nicolaescu, Sergiu Stefan
    Kifor, Claudiu Vasile
    KNOWLEDGE SCIENCE, ENGINEERING AND MANAGEMENT, KSEM 2015, 2015, 9403 : 183 - 189
  • [9] Change is Coming in Automotive R&D
    不详
    R&D MAGAZINE, 2017, 59 (01):
  • [10] Delivering the D in R&D: Increasing Product Outcomes from R&D Projects
    Lane, Joseph P.
    ASSISTIVE TECHNOLOGY FROM ADAPTED EQUIPMENT TO INCLUSIVE ENVIRONMENTS, 2009, 25 : 736 - 741