The Comprehensive Optimal Scheduling Model of Power Supply and Demand Considering Network Constraints

被引:0
|
作者
Wang Gang [1 ]
Wang Ke [1 ]
Liu Jun [1 ]
Ji Wenlu [2 ]
Zhu Hong [2 ]
机构
[1] China Elect Power Res Inst, Nanjing, Jiangsu, Peoples R China
[2] State Grid Jiangsu Elect Power Co, Nanjing, Jiangsu, Peoples R China
关键词
Grid congestion; Flexible load; Source-Net-Load; DR scheduling; Power supply and demand; Maximize comprehensive benefit;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the establishment of the electricity market mechanisms, all of the market participants are in pursuit of maximizing their own interests, and this inevitably causes the network congestion phenomenon appearing in some lines around the power plants which have the lower price. The traditional power grid eliminates congestion mainly through the load shedding. With the upgrading of the interactive capabilities of "Source-Net-Load", flexible load participating in grid scheduling plays a very cost-effective role in solving grid congestion problems. Based on flexible load involved in DR scheduling, to maximize comprehensive benefit, this article establishes the comprehensive optimal scheduling model of power supply and demand considering network constraints. By forming the optimal price and incentives, the model realizes the coordinated scheduling of power supply and demand, and maximizes comprehensive be ne fit at the basis of alleviating the congestion effectively. The optimization model is proved effective and economic with the example of five nodes system.
引用
收藏
页码:2050 / 2054
页数:5
相关论文
共 50 条
  • [31] Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints
    Krishnan, Ashok
    Sampath, L. P. M. I.
    Eddy, Y. S. Foo
    Gooi, H. B.
    [J]. COMPLEXITY, 2018,
  • [32] Supply-Demand Interactive Scheduling Model Considering Short Production Process of Steel Enterprises
    Wang, Haibo
    Zhang, Li
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (15): : 64 - 76
  • [33] Solving the hydrothermal scheduling problem considering network constraints
    Takigawa, Fabricio Y. K.
    da Silva, Edson L.
    Finardi, Erlon C.
    Rodrigues, Rafael N.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2012, 88 : 89 - 97
  • [34] Optimal scheduling of battery storage systems and thermal power plants for supply-demand balance
    Koik, Masakazu
    Ishizaki, Takayuki
    Ramdani, Nacim
    Imura, Jun-ichi
    [J]. CONTROL ENGINEERING PRACTICE, 2018, 77 : 213 - 224
  • [35] Multi-timescale Active Distribution Network Scheduling Considering Demand Response and User Comprehensive Satisfaction
    Sheng, Hongzhang
    Wang, Chengfu
    Li, Bowen
    Liang, Jun
    Yang, Ming
    Dong, Yunhui
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2021, 57 (03) : 1995 - 2005
  • [36] Optimal Dispatching Model of Active Distribution Network Considering Uncertainty of Demand Response
    Xiao, Longhai
    Lei, Xiangbing
    Chen, Qi
    Tang, Huaguo
    Yu, Jialin
    [J]. PROCEEDINGS OF THE 15TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2020), 2020, : 1791 - 1795
  • [37] Optimal Model for Positive Deviation Penalty of Power Retailers Considering Demand Response
    Yu, Xiaobao
    Tan, Zhongfu
    Ma, Jiale
    Qu, Gaoqiang
    De, Gejirifu
    Li, Menglu
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (07): : 120 - 128
  • [38] Optimal Model of Resource Planning for Collaborative Logistics Network Considering Robust Constraints
    Xu Xiaofeng
    Zhao Jinlou
    Song Jiekun
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 3642 - +
  • [39] Probabilistic Model for Microgrids Optimal Energy Management Considering AC Network Constraints
    Javidsharifi, Mahshid
    Niknam, Taher
    Aghaei, Jamshid
    Shafie-khah, Miadreza
    Catalao, Joao P. S.
    [J]. IEEE SYSTEMS JOURNAL, 2020, 14 (02): : 2703 - 2712
  • [40] Supply and Demand Constraints on Future PV Power in the USA
    Basore, Paul A.
    Cole, Wesley J.
    [J]. 2017 IEEE 44TH PHOTOVOLTAIC SPECIALIST CONFERENCE (PVSC), 2017, : 2163 - 2166