Development of a computerized risk management system for international NPP EPC projects

被引:11
|
作者
Yoo, Wi Sung [1 ]
Yang, Jaewoong [2 ]
Kang, Sanghyeok [3 ]
Lee, Sanghyun [4 ]
机构
[1] Construct & Econ Res Inst Korea, Construct Management Div, Seoul 06050, South Korea
[2] Korea Elect Power Corp E& C, Gyeongsangbuk Do 39660, South Korea
[3] Incheon Natl Univ, Dept Civil & Environm Engn, Inchon 22012, South Korea
[4] Korea Hydro & Nucl Power Co LTD, Cent Res Inst, Daejeon 34101, South Korea
关键词
Nuclear Power Plant (NPP); Nuclear Risk Management System (NuRMS); Total Risk Score (TRS); tracking risk variation; NUCLEAR-POWER-PLANT; MODEL; PERFORMANCE;
D O I
10.1007/s12205-016-0784-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Over the past decade, Nuclear Power Plant (NPP) projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the target completion time and cost. NPP projects have frequently exceeded the planned time and cost despite reliable estimates at the start of the project. This was attributed to unpredictable causes at the beginning and to shortage of proper tools to quantitatively analyze the inevitable uncertainties. To overcome these difficulties, computerized systems have been widely proposed in the construction industry as effective aids to proactively control the potential risks and to monitor continuously their status and variation. However, there are few risk management systems focused on NPP projects. In this study, we developed a computer-based risk management system for NPP projects, called Nuclear Risk Management System (NuRMS), which is helpful for furnishing project managers with warning signals as a project is progressing and for tracking the changes in risk variation at a desired confidence level. In developing the NuRMS, the Risk Breakdown Structure (RBS), the weights for risk categorization, computation of the Total Risk Score (TRS), and integration of risk analysis tools with relation-based and cost-loaded activity schedule were core tasks. To demonstrate the efficiency of the developed NuRMS, the system was operated using risk information derived from constructing the auxiliary buildings of Shin-Kori units 3 and 4 located in Korea, as an illustrative case. The results showed the system's capacities and suggested that it may be applied to a real NPP engineering, procurement, and construction project. The developed NuRMS is expected to assist a project manager in monitoring, tracking, and controlling potential impacts of risk events during the overall implementation of NPP projects.
引用
收藏
页码:11 / 26
页数:16
相关论文
共 50 条
  • [1] Development of a computerized risk management system for international NPP EPC projects
    Wi Sung Yoo
    Jaewoong Yang
    Sanghyeok Kang
    Sanghyun Lee
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 11 - 26
  • [2] ISM Based Method for Risk Management of International EPC Projects
    Song, Yimeng
    Hao, Shengyue
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [3] Risk Assessment for International EPC Projects
    Yang, Jing-nan
    Cai, Wei-ning
    Fang, Wei-guo
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2014), 2015, : 143 - 148
  • [4] Partnering to enhance interface management in international EPC projects
    [J]. Tang, Wenzhe (twz@tsinghua.edu.cn), 2017, Tsinghua University (57):
  • [5] A Study on the Engineering Design Risk in International EPC Projects
    Lou Haijun
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1289 - 1295
  • [6] Research on the Risk Identification for the International Engineering Contracting EPC Projects
    Tang, Tang
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 477 - 482
  • [7] The Macro Impacts of International NPP Projects
    Chernyakhovskaya Y.V.
    [J]. Studies on Russian Economic Development, 2018, 29 (1) : 21 - 27
  • [8] The Risk Management under Conditions of Contract for EPC in Overseas Projects
    Lin, Chunguang
    [J]. 2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
  • [9] Improving the management of international development projects
    Rodriguez-Rivero, Rocio
    Ortiz-Marcos, Isabel
    Ballesteros-Sanchez, Luis
    Sanchez, Maria Jesus
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) : 253 - 269
  • [10] Study on Contract Risk Management for International EPC Project
    Yin, Yilin
    Wang, Meiling
    [J]. 2013 INTERNATIONAL CONFERENCE ON MANAGEMENT AND INFORMATION TECHNOLOGY, 2013, : 507 - 515