Research on automatic balance control of self-elevating offshore wind turbine installation vessel

被引:0
|
作者
Wang, Lingling [1 ]
Tang, Wenxian [1 ]
Qi, Jiyang [1 ]
Ma, Bao [1 ]
Cai, Yundi [1 ]
机构
[1] Jiangsu Univ Sci & Technol, Sch Mech Engn, Zhenjiang 10289, Peoples R China
来源
关键词
wind turbine installation vessel; Automatic balance; PLC; PID; STEWART PLATFORM;
D O I
10.4028/www.scientific.net/AMR.468-471.3024
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Automatic balance control in the jacking process of the self-elevating offshore wind turbine installation vessel is the guarantee of the vessel's safe operations. The automatic balance method in the movement of the wind turbine installation vessel is analyzed, and a leveling scheme by the proportion reversing valves as the actuator is proposed. Then, the leveling principle of heavy platform is studied; an automatic balance strategy which is the combination of displacement leveling strategy and angle leveling strategy is given. Also, an automatic balance control system of wind turbine installation vessel which is based on PLC and PROFIBUS-DP fieldbus is established. PLC is as the main controller. Fieldbus adopted to realize data transmission between master and slave. And the balance procedure based on PID is designed. The research shows that the control system has good control effect such as fast response, high precision and good stability.
引用
收藏
页码:3024 / 3030
页数:7
相关论文
共 50 条
  • [21] Development and application of a simulator for offshore wind turbine blades installation
    Ren, Zhengru
    Jiang, Zhiyu
    Skjetne, Roger
    Gao, Zhen
    OCEAN ENGINEERING, 2018, 166 : 380 - 395
  • [22] Evaluating operational strategies for the installation of offshore wind turbine substructures
    Tjaberings, Jorick
    Fazi, Stefano
    Ursavas, Evrim
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2022, 170
  • [23] RISK ASSESSMENT OF HOISTING ABOARD AND INSTALLATION FOR OFFSHORE WIND TURBINE
    Bai, Xu
    Sun, Liping
    Sun, Hai
    PROCEEDINGS OF THE ASME 31ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2012, VOL 2, 2012, : 107 - 114
  • [24] Post-installation adaptation of offshore wind turbine controls
    Smilden, Emil
    Sorum, Stian H.
    Bachynski, Erin E.
    Sorensen, Asgeir J.
    Amdahl, Jorgen
    WIND ENERGY, 2020, 23 (04) : 967 - 985
  • [25] Research on Reliability of Offshore Wind Turbine
    Liu Tianyu
    MANUFACTURING SCIENCE AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 443-444 : 1060 - 1065
  • [26] Shanhaiguan Shipyard to build unique wind turbine installation vessel
    不详
    NAVAL ARCHITECT, 2002, : 32 - 32
  • [28] Special Motion Characteristic of Wind Turbine Installation Vessel in Waves
    Huang, Ya-Nan
    Wang, Wen-Hua
    Liu, Jun
    Wang, Yan-Ying
    INTERNATIONAL JOURNAL OF COMPUTATIONAL METHODS, 2020, 17 (05)
  • [29] VIBRATION CONTROL OF AN OFFSHORE WIND TURBINE
    Alkhoury, Philip
    Ait-Ahmed, Mourad
    Soubra, Abdul-Hamid
    Rey, Valentine
    PROCEEDINGS OF ASME 2021 40TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING (OMAE2021), VOL 9, 2021,
  • [30] Control of the Platform of an Offshore Wind Turbine
    Monteiro, Celso
    da Costa, Jose Sa
    CONTROLO'2014 - PROCEEDINGS OF THE 11TH PORTUGUESE CONFERENCE ON AUTOMATIC CONTROL, 2015, 321 : 313 - 320