RETRACTED: Environmental Impact Assessment of Production Plant during Construction Period (Retracted Article)

被引:2
|
作者
Kong, Lu [1 ]
机构
[1] Northeastern Univ, Sch Marxism, Shenyang 110819, Peoples R China
关键词
D O I
10.1155/2022/2712062
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Based on the construction project of a manufacturing plant, the environmental impact assessment of possible environmental pollution during the construction period was carried out from the perspective of atmosphere, water, noise, and solid waste. The analysis of air pollution indicates that dust and motor vehicle exhaust are the main air pollution factors, of which dust emission is 33 t, and the daily emission of NOx, CO, and THC in tail gas is 5.35 kg, 3.7 kg, and 1.1 kg, respectively. The annual average wind speed of the area where the factory is located is 3.15 m/s, and the average wind speed in August is 2.50 m/s, which is 20.6% lower than the annual average. The annual average monthly precipitation is 59.5 mm, and the precipitation in July is 186.4 mm, which is 213.3% higher than the monthly average. Therefore, summer is the best time for construction. Meanwhile, in addition to taking road hardening measures to reduce emissions, dust can also be restrained through watering, and motor vehicle exhaust is reduced through reasonable operation. Water pollution analysis shows that the pH of groundwater in the factory is within the standard limit range (6.5-8.5), and the maximum standard index is less than 0.1, with a very high level of reaching the standard. Cleaning engineering machinery will produce wastewater containing petroleum substances and suspended solids. The amount of wastewater produced every day is 0.5 m(3), which can be used for dust suppression. The daily amount of sewage during the construction period is 0.6 m(3), which can be directly discharged to the pipe network without polluting local water sources. Noise pollution analysis shows that the minimum distance between day construction and night construction is 50 m and 281 m, respectively. Although there is large construction machinery in the construction area, the construction area itself is in the production area and there are other noise pollution sources around it, so there will not be obvious noise pollution during the construction period. The analysis of solid waste pollution indicates that the total amount of construction waste generated during the construction period is about 4.2 t, and the daily production of domestic waste is 21 kg. Part of various solid wastes is collected and treated in a centralized manner, while the rest can conducted with landfill treatment after part of them is recycled and utilized, without causing significant pollution to the local environment.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] RETRACTED: Digital Construction -The consideration of architecture in digital age (Retracted Article)
    Wu, Min
    Zhou, Wenqin
    [J]. THIRD INTERNATIONAL CONFERENCE ON KNOWLEDGE DISCOVERY AND DATA MINING: WKDD 2010, PROCEEDINGS, 2010, : 387 - 390
  • [42] RETRACTED: Discussion on Green Port Construction of Tianjin Port (Retracted Article)
    He Ying
    Ji Yijun
    [J]. 2011 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL SCIENCE-ICEES 2011, 2011, 11
  • [43] RETRACTED: Discussion on the Construction of Enterprise Internal Audit Informatization (Retracted Article)
    Li, Shenglu
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2022, 2022
  • [44] RETRACTED: On the Visual Construction of Environmental Factors in Modern Art Works from the Perspective of Painting Art (Retracted Article)
    Gong, Shanshan
    [J]. JOURNAL OF ENVIRONMENTAL AND PUBLIC HEALTH, 2022, 2022
  • [45] RETRACTED: Public Sector Performance Assessment Based on DEA Model: The Case of Environmental Policy (Retracted Article)
    Zhang, Rongguang
    [J]. SECURITY AND COMMUNICATION NETWORKS, 2022, 2022
  • [46] RETRACTED: Profile of the Scientific Production in Workers' Health (Retracted Article)
    Soares Bezerra, Marcio Luis
    Neves, Eduardo Borba
    [J]. SAUDE E SOCIEDADE, 2010, 19 (02): : 384 - 394
  • [47] RETRACTED: Advances in toxicological research and risk assessment (Retracted Article)
    Lee, Byung-Mu
    Kacew, Sam
    [J]. JOURNAL OF TOXICOLOGY AND ENVIRONMENTAL HEALTH-PART A-CURRENT ISSUES, 2018, 81 (11): : 383 - 383
  • [48] RETRACTED: A study of Knowledge Management in Construction Project Management (Retracted Article)
    Chen, Zhaozhu
    Liu, Zhaofeng
    [J]. 2011 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL SCIENCE-ICEES 2011, 2011, 11 : 1039 - 1044
  • [49] RETRACTED: Construction and Practice of Teaching Team for General Colleges (Retracted Article)
    Feng, Xianzhang
    [J]. 2009 SECOND INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY AND TRAINING, 2009, : 3 - +
  • [50] RETRACTED: Health Assessment of Urban Landscape River (Retracted Article)
    Zhao Yan-wei
    Wei Xin-feng
    Luo Yun-xiang
    Lu Xiao-fei
    [J]. 2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING, VOLS 1-11, 2009, : 5365 - +