共 47 条
- [21] PLAIN ROLLING AS A PRE-TREATMENT OF CYLINDRICAL COMPONENTS FOR HARD CHROMIUM PLATING WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1969, 59 (08): : 369 - &
- [22] Application and evaluation of ground surface pre-grouting reinforcement for 800-m-deep underground opening through large fault zones Arabian Journal of Geosciences, 2017, 10
- [24] Pre-excavation drilling and grouting for water control and ground improvement in highly variable ground conditions at the Arrowhead Tunnels Project NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 749 - +
- [25] Main influencing factors for regional pre-grouting technology of water hazard treatment in coal seam floor and efficient hole arrangement Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (11): : 134 - 143