Design of the 15 GHz BPM test bench for the CLIC test facility to perform precise stretched-wire RF measurements

被引:2
|
作者
Zorzetti, Silvia [1 ,2 ]
Fanucci, Luca [2 ]
Munoz, Natalia Galindo [1 ]
Wendt, Manfred [1 ]
机构
[1] CERN, CH-1217 Geneva, Switzerland
[2] Univ Pisa, I-56126 Pisa, PI, Italy
关键词
alignment; BPM; linear collider; CLIC; PACMAN; beam diagnostic; impedance transformer;
D O I
10.1088/0957-0233/26/9/094005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Compact Linear Collider (CLIC) requires a low emittance beam transport and preservation, thus a precise control of the beam orbit along up to 50 km of the accelerator components in the sub-mu m regime is required. Within the PACMAN3 (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) PhD training action a study with the objective of pre-aligning the electrical centre of a 15 GHz cavity beam position monitor (BPM) to the magnetic centre of the main beam quadrupole is initiated. Of particular importance is the design of a specific test bench to study the stretched-wire setup for the CLIC Test Facility (CTF3) BPM, focusing on the aspects of microwave signal excitation, transmission and impedance-matching, as well as the mechanical setup and reproducibility of the measurement method.
引用
收藏
页数:9
相关论文
共 1 条
  • [1] rf deflector design of the CLIC test facility CTF3 delay loop and beam loading effect analysis
    Alesini, David
    Marcellini, Fabio
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2009, 12 (03):