rf deflector design of the CLIC test facility CTF3 delay loop and beam loading effect analysis

被引:3
|
作者
Alesini, David [1 ]
Marcellini, Fabio [1 ]
机构
[1] Ist Nazl Fis Nucl, Lab Nazl Frascati, I-00044 Frascati, Roma, Italy
关键词
D O I
10.1103/PhysRevSTAB.12.031301
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
Beam injection and extraction in the delay loop of the CLIC Test Facility 3 (CTF3) for recombination of adjacent bunch trains, is performed by a specially designed rf deflector. A standing wave structure has been chosen for this purpose. Three possible solutions have been investigated, and a comparative analysis is presented. All of them satisfy the essential requirements of the system up to the maximum foreseen energy with the existing klystron. The final design of the rf deflector consists of two identical cavities connected to the rf power source through a hybrid junction that equally splits the power and isolates the klystron from reflections. The rf deflector design, the results of electromagnetic simulations, and the low level rf measurements are illustrated. The impact of beam loading in the rf deflectors on the transverse beam dynamics is also analyzed. The general expression of the single passage transverse wakefield is obtained and a dedicated tracking code has been written to study the multibunch multiturn effects. A complete analysis for different machine parameters and injection errors is presented and discussed. These numerical simulations indicate a tolerable beam emittance growth due to the transverse wakefield in the rf deflectors.
引用
收藏
页数:16
相关论文
共 7 条
  • [1] Effects of the beam loading in the rf deflectors of the CLIC test facility CTF3 combiner ring
    Alesini, D
    Gallo, A
    [J]. PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2004, 7 (03): : 62 - 77
  • [2] The technical realisation of RF kickers for CLIC Test Facility CTF3
    Plawski, E
    Kulinski, S
    Kucharczyk, A
    [J]. PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2787 - 2789
  • [3] Considerations on the design of the decelerator of the CLIC test facility (CTF3)
    Schulte, D
    Syratchev, I
    [J]. 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2185 - 2187
  • [4] Effects of the beam loading in the rf deflectors of the CLIC test facility CTF3 combiner ring (vol 7, art no 034403, 2004)
    Alesini, D
    Gallo, A
    [J]. PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2004, 7 (05):
  • [5] Bunch frequency multiplication in the CLIC test facility CTF3
    Tecker, F
    Corsini, R
    Rinolfi, L
    Biscari, C
    Ghigo, A
    Preger, M
    Royer, P
    Ferrari, A
    [J]. PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 684 - 686
  • [6] RF power source for the compact linear collider test facility (CTF3)
    McMonagle, G
    Bartholome, B
    Brown, P
    Carron, G
    Hanni, R
    Mourier, J
    Rossat, G
    Syratchev, I
    Tanner, L
    Thorndhal, L
    [J]. Proceedings of the 26th International Power Modulator Symposium and 2004 High Voltage Workshop, Conference Record, 2004, : 409 - 412
  • [7] Operational performance and improvements to the RF power sources for the Compact Linear Collider test facility (CTF3) at CERN
    McMonagle, G.
    [J]. 2006 IEEE INTERNATIONAL VACUUM ELECTRONICS CONFERENCE HELD JOINTLY WITH 2006 IEEE INTERNATIONAL VACUUM ELECTRON SOURCES, 2006, : 379 - 379